Filter interviews by
I appeared for an interview in Sep 2024.
Top trending discussions
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.
Collect data on equipment usage and fuel consumption
Calculate fuel efficiency by dividing fuel consumption by equipment usage
Compare fuel efficiency across different equipment to identify outliers
Identify factors that may affect fuel efficiency, such as maintenance or operator behavior
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They have two coils, primary and secondary, wound around a common magnetic core
When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil
The voltage in...
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
CT and PT are electrical transformers used in power systems to measure current and voltage respectively.
CT stands for Current Transformer and is used to measure high currents in power systems.
PT stands for Potential Transformer and is used to measure high voltages in power systems.
CTs are connected in series with the load while PTs are connected in parallel with the load.
CTs are used to measure current for protection a...
I appeared for an interview before Feb 2024.
I applied via Referral and was interviewed in Dec 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
151
salaries
| ₹6.5 L/yr - ₹20 L/yr |
Senior Engineer
151
salaries
| ₹4.8 L/yr - ₹14.9 L/yr |
Manager
103
salaries
| ₹10 L/yr - ₹25 L/yr |
Engineer
69
salaries
| ₹2.2 L/yr - ₹8.2 L/yr |
Assistant General Manager
59
salaries
| ₹19.5 L/yr - ₹30 L/yr |
Suzlon Group
Adani Power
Adani Group
NTPC