Upload Button Icon Add office photos

L&T Power

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Power Production Engineer Interview Questions and Answers

Updated 13 Apr 2022

L&T Power Production Engineer Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is manufacturing
  • Ans. 

    Manufacturing is the process of converting raw materials into finished products through various processes.

    • It involves designing, planning, producing, and delivering products to customers.

    • Manufacturing can be done by hand or through the use of machines.

    • It includes various stages such as material selection, fabrication, assembly, and quality control.

    • Examples of manufacturing industries include automotive, electronics, an

  • Answered by AI
  • Q2. It is manufacturing in this job Casting, welding, drilling,etc

Interview Preparation Tips

Interview preparation tips for other job seekers - In interview before in company

HCLTech

There's no stopping you

We offer diverse programs to shape your career and future

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(4 Questions)

  • Q1. WIND BLADE ASSAMBLY AND LOADING TECHNICAL WORKS
  • Ans. I WAS ALLRADY RECORD IN MY COMPANY . FIRST LOADING TIME FOR 2 SETS BLADES 12 HOURS THEN MY PLAN LOADING TIME FOR 2 SETS ONLY 4 HOURES .NOW 2. 1/2 HOURES IS GOING ON.
  • Answered Anonymously
  • Q2. BEARINGS ASSAMBLY, BLADE BALANCING WORK, (BLADE KG CHEAK), SET DIVED, TEAM HANDLING , 5 S WORKS, QED WORK, REPARING WORK MAINTANANCE SERVICES WORK, SITE REPARING AND PAINT WORK , SITE TO SITE BLADE SHIFTI...
  • Q3. MY PAST COMPANY ENERCON, SUZLON, VESTAS RRB, AND MY OOLDES COMPANY IS MARDAN ENGINEERING FIBER HAND MOLDING MANUFACTURING .
  • Q4. YOU ASK ANY QUESTION

Interview Preparation Tips

Interview preparation tips for other job seekers - FIRST YOU CHECK WORK LIST (JSA), TEAM PLAN AND SAFETY PLANS AFTER TOU DO WORK
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What do you Wark
  • Ans. 

    Fiber line bled manufacturing

  • Answered Anonymously
  • Q2. How much bled meter
  • Ans. 

    The bled meter measures the amount of fluid that has been bled off from a system.

    • The bled meter is used to monitor the bleeding of fluid from a system.

    • It helps in determining the amount of fluid that has been removed from the system.

    • The bled meter readings are important for maintaining the proper fluid levels in the system.

  • Answered by AI
  • Q3. What do you knowlege
  • Ans. 

    I have knowledge in various aspects of production engineering including process optimization, quality control, and equipment maintenance.

    • Knowledge of manufacturing processes and techniques

    • Understanding of quality control methods and tools

    • Experience with equipment maintenance and troubleshooting

    • Familiarity with lean manufacturing principles

    • Ability to analyze production data and identify areas for improvement

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Technical Case Study coding test other
  • Q2. Technical Case Study coding test other
  • Q3. Technical Case Study coding test other

Interview Preparation Tips

Interview preparation tips for other job seekers - Mohit Kumar kori Kashar derwa Pratapgarh,UP

Interview Questionnaire 

1 Question

  • Q1. How we can increase efficiency of boiler ?
  • Ans. 

    Efficiency of a boiler can be increased by improving insulation, optimizing combustion, and regular maintenance.

    • Improve insulation to reduce heat loss

    • Optimize combustion by adjusting air-to-fuel ratio and using efficient burners

    • Regular maintenance to clean and repair components

    • Use economizers to recover waste heat

    • Upgrade to high-efficiency boilers

    • Implement energy management systems to monitor and control boiler operati

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced production engineer with a background in mechanical engineering and a passion for optimizing manufacturing processes.

    • Graduated with a degree in Mechanical Engineering

    • Worked for 5 years in the manufacturing industry

    • Implemented lean manufacturing principles to improve production efficiency

    • Led a team in reducing production costs by 15% through process optimization

  • Answered by AI
  • Q2. What is knocking?
  • Ans. 

    Knocking is an abnormal combustion phenomenon in internal combustion engines.

    • Knocking occurs when the air-fuel mixture in the engine's cylinders ignites prematurely or unevenly.

    • It produces a knocking or pinging sound, which can cause damage to the engine if not addressed.

    • Factors contributing to knocking include low octane fuel, high engine temperatures, and incorrect ignition timing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Face to face technical
  • Q2. Knowledge of All types pressure vessel and Heat exchanger
  • Q3. Drawing understanding
  • Q4. Problem solving
  • Q5. Manpower handling
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Assbly question and press
  • Q2. Scrap control manpower allegation
  • Q3. Shop floor control, material accountable

Interview Preparation Tips

Topics to prepare for Tata Power Production Engineer interview:
  • Production Engineering
  • Communication Skills
Interview preparation tips for other job seekers - Production engineer mobil assbly
And shift incharge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Types of boilers ? Functions of boilers ? Various welding process and various NDT process ?
  • Ans. 

    Types of boilers include fire tube, water tube, and electric boilers. Boilers function to generate steam or hot water for heating or power generation. Various welding processes include TIG, MIG, and stick welding. Various NDT processes include ultrasonic testing, radiography, and magnetic particle testing.

    • Types of boilers: fire tube, water tube, electric boilers

    • Functions of boilers: generate steam or hot water for heat...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
No response

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Topics covered technical and aptitude questions

Round 2 - Technical 

(2 Questions)

  • Q1. Core technical questions
  • Q2. How does a transformer works. Detailed working and parameters to monitor
  • Ans. 

    A transformer works by transferring electrical energy between two or more circuits through electromagnetic induction.

    • Transformers consist of two coils of wire, known as the primary and secondary coils, wrapped around a core made of iron or other magnetic materials.

    • When an alternating current flows through the primary coil, it creates a changing magnetic field which induces a voltage in the secondary coil.

    • The ratio of t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge at good level. Expect some in-depth questions.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is your job profile?
  • Q2. What you know about IMS?
  • Ans. 

    IMS stands for Information Management System, a database and transaction management system used for online transaction processing.

    • IMS is a hierarchical database management system developed by IBM.

    • It is commonly used for high-volume transaction processing in industries like banking, finance, and healthcare.

    • IMS uses a hierarchical model where data is organized in a tree-like structure with parent-child relationships.

    • It s...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Siemens Production Engineer interview:
  • Welding
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Power Interview FAQs

How many rounds are there in L&T Power Production Engineer interview?
L&T Power interview process usually has 2 rounds. The most common rounds in the L&T Power interview process are Resume Shortlist and Technical.
What are the top questions asked in L&T Power Production Engineer interview?

Some of the top questions asked at the L&T Power Production Engineer interview -

  1. What is manufactur...read more
  2. It is manufacturing in this job Casting, welding, drilling,...read more

Recently Viewed

JOBS

Marsh McLennan Global Services

No Jobs

REVIEWS

L&T Power

No Reviews

INTERVIEWS

Steag Energy Services

No Interviews

SALARIES

Steag Energy Services

SALARIES

Steag Energy Services

SALARIES

Steag Energy Services

REVIEWS

L&T Power

No Reviews

SALARIES

Tata Power Solar

REVIEWS

L&T Power

No Reviews

SALARIES

Steag Energy Services

No Salaries

Tell us how to improve this page.

Sopra Steria

Success to our employee's well-being? A work-life balance that's simply unbeatable.

L&T Power Production Engineer Salary
based on 15 salaries
₹2.6 L/yr - ₹7.8 L/yr
47% more than the average Production Engineer Salary in India
View more details

L&T Power Production Engineer Reviews and Ratings

based on 4 reviews

4.0/5

Rating in categories

3.6

Skill development

4.9

Work-life balance

3.0

Salary

4.7

Job security

3.0

Company culture

3.0

Promotions

3.2

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
211 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
151 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
105 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant General Manager
59 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Power with

BHEL

4.1
Compare

Thermax Limited

4.1
Compare

Siemens

4.1
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview