Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by L&T Heavy Engineering Team. If you also belong to the team, you can get access from here

L&T Heavy Engineering Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 472 Reviews

Filter interviews by

L&T Heavy Engineering Deputy General Manager Interview Questions and Answers

Updated 11 Dec 2024

L&T Heavy Engineering Deputy General Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2023. There were 4 interview rounds.

Round 1 - Group Discussion 

Project Planning, Primavera, Project management, scope management, change management

Round 2 - Group Discussion 

EPC Schedule, primavera, MS Project, Presentation, Nevis work, Autocad

Round 3 - Aptitude Test 

Plan variance/ actual variance

Round 4 - Technical 

(2 Questions)

  • Q1. Project Planning for EPC Project
  • Ans. 

    Key considerations for project planning in an EPC project include scope definition, resource allocation, risk management, scheduling, and communication.

    • Define project scope clearly to avoid scope creep and ensure all stakeholders are aligned.

    • Allocate resources effectively to meet project deadlines and budget constraints.

    • Implement robust risk management strategies to identify and mitigate potential risks throughout the ...

  • Answered by AI
  • Q2. Primavera

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Organisation and what made me to apply
  • Q2. Plant related performance
Round 2 - One-on-one 

(2 Questions)

  • Q1. Policies and Man management
  • Q2. Roles and responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Be to your basics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(4 Questions)

  • Q1. Brief description of self
  • Q2. Why do you want to leave the present company
  • Q3. What motivates you to join our company
  • Ans. 

    I am motivated to join your company because of its strong reputation in the industry, opportunities for growth and development, and the chance to work on challenging projects.

    • Strong reputation in the industry

    • Opportunities for growth and development

    • Challenging projects

  • Answered by AI
  • Q4. What way you can contribute to our company
Round 2 - One-on-one 

(2 Questions)

  • Q1. Your previous company is a TATA Company, then why do you want to leave that and join L&T Construction?
  • Ans. 

    I am looking for new challenges and opportunities for growth in a different company like L&T Construction.

    • Seeking new challenges and opportunities for growth

    • Interested in the projects and work culture at L&T Construction

    • Want to broaden my skill set and experience by working in a different environment

  • Answered by AI
  • Q2. How to manage local problems like local administration, political interference, permissions in a project which is inside a municipal corporation area
  • Ans. 

    Local problems like administration, political interference, permissions in a project within a municipal corporation area can be managed through effective communication and collaboration.

    • Establish strong relationships with local administration officials and politicians to address any issues that may arise

    • Clearly communicate the project's goals and benefits to gain support from local stakeholders

    • Ensure all necessary perm...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. HV Battery construction and Working
  • Ans. 

    HV Battery construction and working involves multiple cells connected in series and parallel to store and release electrical energy.

    • HV batteries are typically made up of multiple cells connected in series and parallel to achieve the desired voltage and capacity.

    • The cells are usually lithium-ion or nickel-metal hydride, with each cell containing an anode, cathode, and electrolyte.

    • The construction includes a casing to ho...

  • Answered by AI
  • Q2. How is the LV & HV System Works in Electrical Vehicles
  • Ans. 

    LV & HV systems in electric vehicles work together to power the vehicle efficiently and safely.

    • LV system (low voltage) powers auxiliary systems like lights, radio, and power windows.

    • HV system (high voltage) powers the main components like the motor and battery.

    • LV system typically operates at 12V, while HV system operates at 200-800V.

    • HV system requires special safety precautions due to high voltage levels.

    • Both systems w...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Package I am getting, and expectation
  • Q2. Salary discussion
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Interview Mein 8 se 10 prashn Puche Jaate Hain
  • Q2. Answer ya question ka answer Uttar dene per hi to selection Kiya jata hai
Round 2 - HR 

(1 Question)

  • Q1. Char Ka kam hai ki customer care se baat hone per Agar usse Kam Nahin hone per vichar ko call kiya jata hai
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Tell me about your self 2. Tell me about your day to day work and roles and responsibilities in current role 3. Projects taken to use RCA PCA and resolved issues 4. Project planning execution and how y...

Interview Preparation Tips

Topics to prepare for Quess Deputy Manager interview:
  • Diagnostics
  • Electricals
  • Production Planning
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

FOR FIRST ROUND OF INTERVIEW ITS TAKE 10 TO 15 MINUTES

Round 2 - One-on-one 

(1 Question)

  • Q1. WHY YOU CHOOSE THIS COMPANY
  • Ans. 

    I chose this company because of its strong reputation in the industry and commitment to employee growth and development.

    • Strong reputation in the industry

    • Commitment to employee growth and development

    • Positive company culture

    • Opportunities for advancement

    • Innovative projects and initiatives

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About my self and background
  • Q2. Cement and Industry related questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. About area and demography
  • Q2. About your roal and ur market

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about your area and demographic
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Case Study 

How to handle employee grievances

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Mills and wagon tippler

L&T Heavy Engineering Interview FAQs

How many rounds are there in L&T Heavy Engineering Deputy General Manager interview?
L&T Heavy Engineering interview process usually has 4 rounds. The most common rounds in the L&T Heavy Engineering interview process are Group Discussion, Aptitude Test and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 696 Interviews
Siemens Interview Questions
4.1
 • 425 Interviews
Tata Projects Interview Questions
4.3
 • 400 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
Voltas Interview Questions
4.0
 • 123 Interviews
Apco Infratech Interview Questions
3.8
 • 111 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all

Fast track your campus placements

View all

L&T Heavy Engineering Deputy General Manager Reviews and Ratings

based on 7 reviews

4.2/5

Rating in categories

4.3

Skill development

3.8

Work-Life balance

3.4

Salary & Benefits

4.6

Job Security

3.8

Company culture

3.6

Promotions/Appraisal

4.0

Work Satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
39 salaries
unlock blur

₹7.6 L/yr - ₹13.5 L/yr

Senior Engineer
35 salaries
unlock blur

₹7 L/yr - ₹10 L/yr

Design Engineer
20 salaries
unlock blur

₹1.9 L/yr - ₹7.5 L/yr

Production Engineer
18 salaries
unlock blur

₹2.4 L/yr - ₹7.5 L/yr

Graduate Engineer Trainee (Get)
16 salaries
unlock blur

₹6 L/yr - ₹6.4 L/yr

Explore more salaries
Compare L&T Heavy Engineering with

BHEL

4.2
Compare

Tata Projects

4.3
Compare

Larsen & Toubro Limited

4.0
Compare

Thermax Limited

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview