Upload Button Icon Add office photos

L&T Energy Hydrocarbon

Compare button icon Compare button icon Compare

Filter interviews by

L&T Energy Hydrocarbon Engineer Project Management Interview Questions and Answers for Experienced

Updated 24 Mar 2024

L&T Energy Hydrocarbon Engineer Project Management Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Selection of Control Valve
  • Ans. 

    Selection of control valve is crucial for efficient project management in engineering.

    • Consider the type of fluid being controlled (liquid, gas, steam, etc.)

    • Evaluate the flow rate and pressure drop requirements

    • Take into account the temperature and pressure of the system

    • Factor in the material compatibility with the process fluid

    • Choose between different types of control valves such as globe, butterfly, ball, etc.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Engineer Project Management interview:
  • Control Valves
  • Flowmeter

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about L&T Energy Hydrocarbon?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,...

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human

Engineer Project Management Interview Questions Asked at Other Companies for Experienced

Q1. Which is basic step of project & How to complete project mana ... read more
Q2. How would you resolve a conflict between internal stakeholders?
Q3. Project stages and project life cycle.planning and implementation ... read more
Q4. Selection of Control Valve
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. What is consolidation of soil?
  • Ans. 

    Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.

    • Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.

    • This process is time-dependent and can take years to complete.

    • Consolidation can cause settlement and deformation of structures built on top of the...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Assistant Manager interview:
  • Soil Mechanics
Interview preparation tips for other job seekers - Prepare technically basic questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and experience
Round 3 - Technical 

(4 Questions)

  • Q1. Chiller trouble shooting
  • Q2. Work of cchiller
  • Ans. 

    A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.

    • Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.

    • They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.

    • Chillers can be water-cooled or air-cooled, depending on the app...

  • Answered by AI
  • Q3. Alarm and solutions
  • Q4. Controlling andetc
Round 4 - Group Discussion 

Salary and job responsibilities

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Engineer Project Management interview for experienced candidates?
L&T Energy Hydrocarbon interview process for experienced candidates usually has 1 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process for experienced candidates are Technical.
How to prepare for L&T Energy Hydrocarbon Engineer Project Management interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L&T Energy Hydrocarbon. The most common topics and skills that interviewers at L&T Energy Hydrocarbon expect are Project Management, Procurement, Instrumentation, SCADA and MEP.

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

2-4 weeks 100%
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 123 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.8
 • 63 Interviews
Psp Projects Interview Questions
3.9
 • 59 Interviews
View all
L&T Energy Hydrocarbon Engineer Project Management Salary
based on 19 salaries
₹9.2 L/yr - ₹27 L/yr
14% less than the average Engineer Project Management Salary in India
View more details

L&T Energy Hydrocarbon Engineer Project Management Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

2.5

Work-life balance

4.0

Salary

4.5

Job security

3.5

Company culture

3.5

Promotions

4.5

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
814 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Manager
316 salaries
unlock blur

₹15 L/yr - ₹27 L/yr

Senior Engineer
250 salaries
unlock blur

₹4.1 L/yr - ₹13 L/yr

Piping Engineer
150 salaries
unlock blur

₹2.5 L/yr - ₹12.9 L/yr

Assistant General Manager
127 salaries
unlock blur

₹12 L/yr - ₹50 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
write
Share an Interview