L&T Energy Hydrocarbon Engineer Project Management Interview Questions and Answers

Updated 24 Mar 2024

L&T Energy Hydrocarbon Engineer Project Management Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Selection of Control Valve
  • Ans. 

    Selection of control valve is crucial for efficient project management in engineering.

    • Consider the type of fluid being controlled (liquid, gas, steam, etc.)

    • Evaluate the flow rate and pressure drop requirements

    • Take into account the temperature and pressure of the system

    • Factor in the material compatibility with the process fluid

    • Choose between different types of control valves such as globe, butterfly, ball, etc.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Engineer Project Management interview:
  • Control Valves
  • Flowmeter

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Many technical questions was asked regarding JJM Project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Is codes and qc knowledge quality regarding question
Round 2 - Technical 

(1 Question)

  • Q1. Is codes and technical works details
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Field Experience
  • Q2. Testing Methodology

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewees must have good knowledge on their past experiences as most of the questions were generally asked from the gained experiences from the past field. Apart from this a good technical knowledge on the basic aspects of civil engineering a one must have such as surveying testing and processes of construction and the steps involved in the execution work etc
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of Making Minor Bridge?
  • Ans. 

    The process of making a minor bridge involves planning, design, construction, and inspection.

    • 1. Planning phase involves determining the location, size, and type of bridge needed.

    • 2. Design phase includes creating detailed drawings and calculations for the bridge structure.

    • 3. Construction phase involves building the foundation, supports, and deck of the bridge.

    • 4. Inspection phase ensures the bridge meets safety and quali...

  • Answered by AI
  • Q2. How do you assure piling Point ?
  • Ans. 

    Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.

    • Conduct soil investigation to determine soil conditions and suitability for piling.

    • Select appropriate piling equipment based on soil conditions and project requirements.

    • Monitor the piling process to ensure proper installation and alignment of piles.

    • Perform load tests on completed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you change your last Company?
  • Q2. What your salary Expectations ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident towards your Knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Execution of Elevated Viaduct (ROB) 6.2KM 1200 numbers pile (Friction & end Bearing Pile) Foundation ROB Pile Cap and Pier, PSC T-Type Pier Cap, Post Tensioning Girder,Bow string (ROB) structure box interc...
  • Ans. 

    The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.

    • Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.

    • Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...

  • Answered by AI
  • Q2. Preparation of the planning of site execution day by day as per available drawing. Planning & indenting daily requirement of Labour, Construction Machinery, and Materials &Formwork. Organizing various dail...

Interview Preparation Tips

Interview preparation tips for other job seekers - I certify also that all relative document pertaining my qualifications areon my file and is readily accessible in the case needed further.

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Engineer Project Management interview?
L&T Energy Hydrocarbon interview process usually has 1 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process are Technical.
How to prepare for L&T Energy Hydrocarbon Engineer Project Management interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L&T Energy Hydrocarbon. The most common topics and skills that interviewers at L&T Energy Hydrocarbon expect are Project Management, Procurement, Instrumentation, SCADA and MEP.

Tell us how to improve this page.

L&T Energy Hydrocarbon Engineer Project Management Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 53 Interviews
View all
L&T Energy Hydrocarbon Engineer Project Management Salary
based on 19 salaries
₹9.2 L/yr - ₹27 L/yr
12% less than the average Engineer Project Management Salary in India
View more details

L&T Energy Hydrocarbon Engineer Project Management Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

4.0

Skill development

2.5

Work-life balance

4.0

Salary

4.5

Job security

3.5

Company culture

3.5

Promotions

4.5

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
726 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
328 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
253 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Piping Engineer
138 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
118 salaries
unlock blur

₹17 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview