L&T Construction Process Engineer-Plant Design Interview Questions and Answers

Updated 2 Aug 2021

L&T Construction Process Engineer-Plant Design Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Draw p&id structure.
  • Ans. 

    A P&ID (piping and instrumentation diagram) is a graphical representation of a process system showing the piping, equipment, and instrumentation details.

    • P&ID typically includes symbols for valves, instruments, and equipment

    • Lines on the P&ID represent process piping and show the direction of flow

    • P&ID also includes information on process control and safety systems

    • P&ID is used by process engineers to design and optimize p...

  • Answered by AI
  • Q2. Line sizing formula, PSV types and it's uses.
  • Ans. 

    Line sizing formula, PSV types and uses

    • Line sizing formula is used to determine the appropriate diameter of a pipeline based on the flow rate and pressure drop

    • PSV types include conventional, bellows, and pilot-operated relief valves

    • Conventional PSVs are typically used for low-pressure applications, while pilot-operated PSVs are used for high-pressure applications

    • PSVs are used to protect equipment and personnel from ove...

  • Answered by AI
  • Q3. Pump hydraulic realted questions
  • Q4. Control valve related questions
  • Q5. Other things like line list, equipment list, instruments questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Tips:-
1) confidence
2) technically sound
3)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Pumps, line and hydrualics

Process Engineer Interview Questions & Answers

Larsen & Toubro Limited user image shailendra narendra chaudekar

posted on 14 Oct 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Draw P&ID of Pump System
  • Ans. 

    P&ID of Pump System shows the piping, equipment, instrumentation, and control interlocks of the system.

    • Include pump symbol with arrows indicating flow direction

    • Label all equipment such as pumps, valves, tanks, etc.

    • Show instrumentation like pressure gauges, flow meters, etc.

    • Indicate control interlocks and safety features

    • Use standard symbols and colors as per industry guidelines

  • Answered by AI
  • Q2. What is npsh available
  • Ans. 

    NPSH available stands for Net Positive Suction Head available, which is a measure of the absolute pressure at the suction port of a pump.

    • NPSH available is the total suction head in feet absolute at the suction nozzle of the pump.

    • It is important for ensuring that the pump does not cavitate, which can cause damage to the pump and decrease efficiency.

    • NPSH available is calculated by subtracting the vapor pressure of the li...

  • Answered by AI
  • Q3. How to calculate NPSH
  • Ans. 

    NPSH is calculated by subtracting the vapor pressure of the liquid from the total head of the pump.

    • NPSH = H - (Pv / rho * g)

    • H is the total head of the pump

    • Pv is the vapor pressure of the liquid

    • rho is the density of the liquid

    • g is the acceleration due to gravity

    • Ensure all units are consistent (e.g. meters, Pascal, kg/m^3, m/s^2)

  • Answered by AI
  • Q4. Draw two phase system p&ID
  • Ans. 

    A two-phase system P&ID shows the process flow of a system with two distinct phases.

    • Identify the two phases involved in the system (e.g. liquid-gas, solid-liquid).

    • Use different symbols to represent each phase on the P&ID.

    • Show the flow direction and connections between components in the system.

    • Include labels and legends to explain the components and their functions.

    • Ensure clarity and consistency in the representation of

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - do pump and heat exchanger
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Normal level English grammer and General Maths

Round 3 - Typing Test 

(4 Questions)

  • Q1. Normal and easy
  • Q2. Tell me about yourself
  • Q3. Strength and warkness
  • Q4. About Insurance
Round 4 - HR 

(1 Question)

  • Q1. Tell me about Yourself
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What are types of psv
  • Ans. 

    Types of PSV include conventional spring-loaded PSV, pilot-operated PSV, balanced bellows PSV, and rupture disc PSV.

    • Conventional spring-loaded PSV

    • Pilot-operated PSV

    • Balanced bellows PSV

    • Rupture disc PSV

  • Answered by AI
  • Q2. What are heat exchanger types
  • Ans. 

    Heat exchanger types include shell and tube, plate, finned tube, and double pipe.

    • Shell and tube heat exchanger

    • Plate heat exchanger

    • Finned tube heat exchanger

    • Double pipe heat exchanger

  • Answered by AI

Skills evaluated in this interview

I applied via Job Portal and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Past experience question...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confidence and everything ask from your past work.....and also ask from basic

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Process Engineer-Plant Design interview?

Some of the top questions asked at the L&T Construction Process Engineer-Plant Design interview -

  1. Line sizing formula, PSV types and it's us...read more
  2. Draw p&id structu...read more
  3. Other things like line list, equipment list, instruments questi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 412 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
720 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
527 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
380 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
324 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview