L&T Construction Interview Questions, Process, and Tips

Updated 9 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 575 questions

L&T Construction Interview Experiences

Popular Designations

746 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.

Design Engineer Interview Questions asked at other Companies

Q1. Stress Strain curve, What will happen if you use petrol in diesel engine and Diesel in petrol engone.
View answer (5)

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for L&T Construction Formwork Foreman interview:
  • Form work
Interview preparation tips for other job seekers - Be capable work
Be availabule for and see

Top L&T Construction Formwork Foreman Interview Questions and Answers

Q1. How to measure diagonal?
View answer (1)

Formwork Foreman Interview Questions asked at other Companies

Q1. What do you khow Height Rise Building Mivan Formwork system work.
View answer (2)

I applied via Campus Placement

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company with High package and good company to improve yourself

Graduate Commercial Trainee (Gct) Interview Questions asked at other Companies

Q1. introduce abt urself
View answer (1)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic knowledge about civil engineering field

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident about our work which is helpful for jobs

Top L&T Construction Junior Engineer Civil Interview Questions and Answers

Q1. What is the means of PWD department
View answer (2)

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and don't try to bluff them, if you don't know the answer simply tell them that I can't recall the answer at the moment don't beat them around the bushes.

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Get interview-ready with Top L&T Construction Interview Questions

Interview Questionnaire 

8 Questions

  • Q1. How many Dia types of Reaifocement -6mm to 36 mm
  • Ans. 

    There are various types of reinforcement diameters ranging from 6mm to 36mm.

    • Reinforcement diameters range from 6mm to 36mm

    • Types of reinforcement include plain round bars, deformed bars, and twisted bars

    • Other types of reinforcement include welded wire fabric and prestressing steel

    • The specific types and diameters of reinforcement used depend on the structural requirements of the project

  • Answered by AI
  • Q2. What is space bar -bar to bar in this name gape in use (pit Rode)
  • Ans. 

    The question is nonsensical and does not have a clear answer.

    • The question does not make sense and is likely a mistake or a joke.

    • There is no clear meaning to 'space bar -bar to bar' in the context of the given name.

    • It is best to ask for clarification or move on to another question.

  • Answered by AI
  • Q3. What types of cover blocks-pvc cover blocks, concrete cover blocks
  • Ans. 

    Cover blocks are used to maintain the required distance between the reinforcement steel and the formwork.

    • PVC cover blocks are lightweight and easy to handle.

    • Concrete cover blocks are strong and durable.

    • Cover blocks are available in different sizes and shapes.

    • They are used to prevent corrosion of reinforcement steel.

    • Cover blocks ensure the required concrete cover to the reinforcement steel.

    • They are essential for the dur

  • Answered by AI
  • Q4. What size of cover blocks-25mm,30mm,40mm,50mm
  • Ans. 

    Cover blocks are available in various sizes such as 25mm, 30mm, 40mm, and 50mm.

    • Cover blocks are used to maintain the required distance between the reinforcement and the formwork.

    • The size of the cover block depends on the diameter of the reinforcement used.

    • For example, for a 12mm diameter reinforcement, a 25mm cover block is used.

    • The cover blocks are made of materials such as concrete, plastic, or rubber.

    • The selection o...

  • Answered by AI
  • Q5. What is lap length-dia*50
  • Ans. 

    Lap length is the length of overlap between two reinforcing bars in a concrete structure.

    • Lap length is calculated by multiplying the diameter of the bar by 50.

    • It is important to ensure proper lap length to maintain the strength and stability of the structure.

    • Lap length varies depending on the type of structure and the load it will bear.

    • For example, in a beam, the lap length should be at least 50 times the diameter of t...

  • Answered by AI
  • Q6. What is a chear bar-top mat/bottom mat space
  • Ans. 

    A chear bar-top mat/bottom mat space is a designated area on a bar where mats are placed to catch spills and protect the bar surface.

    • It is a common feature in bars and restaurants.

    • The mats are usually made of rubber or silicone.

    • They come in various sizes and shapes to fit different bar configurations.

    • The space is usually located in front of the bartender or on the bar top.

    • It helps to keep the bar clean and hygienic.

  • Answered by AI
  • Q7. What types of length of bar-12m
  • Ans. 

    Bar length of 12m is a standard length used in construction industry.

    • 12m is a common length for reinforcing steel bars used in construction

    • Longer bars may be used for specific projects or custom orders

    • Shorter bars may be cut from longer ones to fit specific needs

  • Answered by AI
  • Q8. What is link bar-column vertical in use of space
  • Ans. 

    Link bar-column vertical is a design technique that maximizes the use of space by placing links in a vertical column.

    • Link bar-column vertical is a navigation design technique that places links in a vertical column on the side of a webpage.

    • This design technique is commonly used on websites with a lot of content, as it allows for more space to be used for the main content.

    • Examples of websites that use link bar-column ver...

  • Answered by AI

Top L&T Construction Junior Consultant Interview Questions and Answers

Q1. What types of cover blocks-pvc cover blocks, concrete cover blocks
View answer (1)

Junior Consultant Interview Questions asked at other Companies

Q1. Difference between standard and custom objects? Difference between flow and process builder, and which is better in which way? What are triggers? Write a basic trigger to update contacts from account when certain changes are made. Security ... read more
View answer (2)

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and prepare for the extempore well which will be for one minute along with the interview.

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1.  How much Experience
  • Q2. What experience

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 year experience architectural draftsman

Architectural Draughtsman Interview Questions asked at other Companies

Q1. Do you know work on layers and different scales in AutoCAD?
View answer (6)

Interview Questions & Answers

user image Anonymous

posted on 18 Feb 2022

I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have work in one location atleast 5years you will get job easily at L&T.

PM Engineer Interview Questions & Answers

user image Anonymous

posted on 13 May 2022

I applied via Recruitment Consulltant and was interviewed in Apr 2022. There was 1 interview round.

Interview Preparation Tips

Topics to prepare for L&T Construction PM Engineer interview:
  • CNC Machines
  • Lathe Machine
  • VMC Machine
Interview preparation tips for other job seekers - Mobile XXXXX
Gmail - *****

PM Engineer Interview Questions asked at other Companies

Q1. What is procedure of testing the transformer
View answer (1)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 851 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
705 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
494 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
410 salaries
unlock blur

₹1.6 L/yr - ₹9.1 L/yr

Assistant Engineering Manager
324 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview