Filter interviews by
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jul 2023. There were 3 interview rounds.
About materials management
Materials items code wise separate and value of materials group code wise.
Top trending discussions
posted on 25 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
The actual size of a horizontal 1.5 meter line is 1.5 meters in length.
The actual size of a horizontal 1.5 meter line is 1.5 meters in length.
Horizontal refers to a line or object that is parallel to the horizon or ground.
1.5 meters is a measurement of length, indicating the distance covered by the line horizontally.
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
I can handle inventory efficiently by implementing proper tracking systems and conducting regular audits.
Implementing a barcode system for easy tracking
Conducting regular physical inventory counts
Analyzing sales data to forecast demand
Maintaining accurate records of all inventory transactions
Ensuring proper storage and handling of inventory
Collaborating with other departments to optimize inventory levels
I have over 5 years of experience in retail management, including overseeing store operations, managing inventory, and leading a team of employees.
Managed store operations to ensure smooth functioning
Handled inventory management to optimize stock levels
Led a team of employees to achieve sales targets
Implemented strategies to improve customer satisfaction
Trained new staff on company policies and procedures
MRN stands for Material Receipt Note, GRN stands for Goods Receipt Note, and STN stands for Stock Transfer Note.
MRN is a document used to record the receipt of materials from a supplier.
GRN is a document used to record the receipt of goods from a supplier.
STN is a document used to record the transfer of stock from one location to another.
Material receiving process involves accepting, inspecting, and recording incoming materials for a store.
Accepting deliveries from suppliers
Inspecting materials for quality and quantity
Recording received materials in inventory system
Notifying relevant departments of received materials
Resolving any discrepancies or issues with received materials
There are mainly three grades of cement commonly used in construction: Ordinary Portland Cement (OPC), Portland Pozzolana Cement (PPC), and Portland Slag Cement (PSC.
Ordinary Portland Cement (OPC) is the most commonly used type of cement.
Portland Pozzolana Cement (PPC) is a blend of OPC and pozzolanic materials like fly ash, silica fumes, etc.
Portland Slag Cement (PSC) is a blend of OPC and granulated blast furnace sla
TMT bars typically range from 6mm to 40mm in diameter.
TMT bars come in various diameters, commonly ranging from 6mm to 40mm.
The diameter of TMT bars is usually specified by the manufacturer or supplier.
The diameter of TMT bars can vary based on the specific construction requirements.
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Stored material refers to any items or products that are kept in a designated storage area for future use or distribution.
Stored material can include inventory, supplies, equipment, and raw materials.
Examples of stored material in a retail setting may include clothing, electronics, and household goods.
Proper organization and labeling of stored material is essential for efficient inventory management.
Regular inventory c...
Raw materials are the basic materials used in the production of goods.
Raw materials are the basic materials used in the production of goods
Examples include wood, metal, plastic, fabric, chemicals, etc.
Stored raw materials need to be properly organized and managed to ensure efficient production processes
posted on 18 Nov 2023
I was interviewed in Oct 2023.
I applied via Walk-in and was interviewed in Feb 2023. There were 5 interview rounds.
Tum kya krte ho ghar msi jfyjd btsthh
How can nahi bataunga tu rehnc grfh
The question seems to be gibberish and does not make sense.
The question needs to be rephrased or clarified.
It is important to understand the context of the question.
Ask for clarification or more information if needed.
Interview experience
based on 10 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
874
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
521
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
373
salaries
| ₹1.2 L/yr - ₹8.3 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA