Updated 12 Dec 2024

L&T Construction Refractory Manager Interview Experiences

1 interview found

Refractory Manager Interview Questions & Answers

user image mithalesh kumar Ray

posted on 12 Dec 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Refractory related steel melting shop
  • Q2. Refractory brick
Round 2 - Technical 

(1 Question)

  • Q1. Site pursing area refractory

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Computer aptitude test

Round 2 - HR 

(1 Question)

  • Q1. Tell about yourself and your interests what are your hobbies etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be thorough in subject gained in graduation

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Refractory Manager interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Technical.
What are the top questions asked in L&T Construction Refractory Manager interview?

Some of the top questions asked at the L&T Construction Refractory Manager interview -

  1. Refractory related steel melting s...read more
  2. Site pursing area refract...read more
  3. Refractory br...read more

Tell us how to improve this page.

L&T Construction Refractory Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 149 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
703 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
489 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview