L&T Construction Manager Mechanical Interview Questions and Answers

Updated 3 Jul 2024

L&T Construction Manager Mechanical Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced mechanical engineer with a strong background in project management and team leadership.

    • Over 10 years of experience in mechanical engineering

    • Managed multiple projects from conception to completion

    • Led cross-functional teams to achieve project goals

    • Proficient in CAD software and technical drawings

  • Answered by AI
  • Q2. Technical knowledge from present project and previous company projects.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Basic Mechanical Engineering.
  • Q2. IC engine, Thermo, Mechanics, Drawing.
  • Q3. Lots of Engineering Quotation.
  • Q4. Site related Quotation etc.
  • Q5. Drawing , Design , Costing , budget

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through in book.
Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - What you know told boldly and answer with smile

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Salary discussion and some professional questions.
  • Q2. Technical realated your stream

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good organization for learning and self growth purpose.good employee welfare.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Manager Mechanical interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are Technical.

Tell us how to improve this page.

L&T Construction Manager Mechanical Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 149 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Manager Mechanical Salary
based on 12 salaries
₹12 L/yr - ₹20 L/yr
7% more than the average Manager Mechanical Salary in India
View more details

L&T Construction Manager Mechanical Reviews and Ratings

based on 3 reviews

3.1/5

Rating in categories

2.0

Skill development

1.5

Work-life balance

3.0

Salary

4.0

Job security

3.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
703 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
489 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview