Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Design Engineer & Modeler Interview Questions and Answers

Updated 20 Mar 2021

L&T Construction Design Engineer & Modeler Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technically or Software

Interview Preparation Tips

Interview preparation tips for other job seekers - I have experienced that's why it was easy to me

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is copy monitor
  • Ans. 

    Copy monitor is a tool in Revit that allows users to monitor changes in linked models and update their own model accordingly.

    • Copy monitor helps ensure that changes in linked models are reflected in the user's model

    • It can be used to track changes in elements such as walls, doors, windows, etc.

    • Users can review and accept or reject changes detected by copy monitor

    • It helps maintain coordination and consistency between link

  • Answered by AI
  • Q2. How many types parameters
  • Ans. 

    There are various types of parameters used in electrical BIM modeling.

    • There are parameters for electrical equipment such as voltage, current, power rating, etc.

    • Parameters for cable trays, conduits, and other electrical components.

    • Parameters for system properties like load calculations, circuit information, etc.

  • Answered by AI
  • Q3. How to make sheet
  • Ans. 

    To make a sheet, you need to create a new sheet in the software and then add views, annotations, and schedules as needed.

    • Open the software and create a new sheet

    • Add views of the model to the sheet

    • Insert annotations and dimensions

    • Include schedules if required

    • Organize the layout of the sheet for clarity

    • Review and finalize the sheet before printing or sharing

  • Answered by AI
  • Q4. How to copy monitory
  • Ans. 

    To copy monitory, you can use a software program to duplicate the display output onto another monitor or screen.

    • Use the display settings on your computer to duplicate the screen onto another monitor.

    • Connect the second monitor to your computer using a VGA, HDMI, or DisplayPort cable.

    • Adjust the resolution and orientation of the second monitor to match your preferences.

    • Ensure that both monitors are powered on and recogniz

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Assignment 

The syllabus covers topics related to electrical engineering and associated software applications.

Round 2 - HR 

(4 Questions)

  • Q1. What is the working principle of transformers?
  • Q2. What are the differences between a star-delta starter and a direct-on-line (DOL) starter?
  • Q3. What is the earthing code?
  • Q4. What is the process of cable glanding?

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AtkinsRealis Interview Questions
4.0
 • 86 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
707 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Civil Engineer
315 salaries
unlock blur

₹1.8 L/yr - ₹10.3 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview