Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Civil Engineer-Water/Wastewater Interview Questions and Answers

Updated 9 Sep 2020

L&T Construction Civil Engineer-Water/Wastewater Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. What is sedimention?
  • Ans. 

    Sedimentation is the process of settling or deposition of suspended particles in water or wastewater.

    • It is a physical water treatment process.

    • It involves the use of gravity to separate solid particles from water.

    • Sedimentation tanks are used in water treatment plants to remove suspended solids.

    • It is also used in wastewater treatment to remove settleable solids before further treatment.

    • The settled solids are called sludg...

  • Answered by AI
  • Q2. What Is Flock?
  • Ans. 

    Flock is a process of adding chemicals to wastewater to create clusters of particles that can be easily removed.

    • Flock is used in wastewater treatment to remove suspended solids and other impurities.

    • Chemicals like alum or ferric chloride are added to wastewater to create flocs.

    • Flocs are clusters of particles that can be easily removed through sedimentation or filtration.

    • Flock is an important step in the wastewater treat...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

I applied via LinkedIn and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Question asked from my CV?

Interview Preparation Tips

Interview preparation tips for other job seekers - make your resume genuinely, avoid unwanted skills that you are not fit for that skill

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Civil Engineer-Water/Wastewater interview?

Some of the top questions asked at the L&T Construction Civil Engineer-Water/Wastewater interview -

  1. What is sedimenti...read more
  2. What Is Flo...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Civil Engineer-Water/Wastewater Salary
based on 4 salaries
₹4.8 L/yr - ₹5.2 L/yr
At par with the average Civil Engineer-Water/Wastewater Salary in India
View more details
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
706 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview