Filter interviews by
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
All about QMS work and auditing skill
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
Group discussion is very friendly way ☺️
I applied via Campus Placement and was interviewed in Jan 2024. There was 1 interview round.
Kyungshin Industrial Motherson interview questions for popular designations
I applied via Newspaper Ad and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via campus placement at NRI Institute of Technology, Ranga Reddy and was interviewed in Nov 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2022. There were 4 interview rounds.
Yes, I am familiar with both e-cad and m-cad tools.
E-CAD tools are used for designing electronic circuits and systems, while M-CAD tools are used for mechanical design and engineering.
Examples of E-CAD tools include Altium Designer, Eagle PCB, and KiCAD.
Examples of M-CAD tools include SolidWorks, AutoCAD, and CATIA.
I have experience using both types of tools and am comfortable with their respective functionalities.
I use various commands depending on the task at hand.
For programming: git, npm, python, java, gcc
For file management: cd, ls, mkdir, rm, mv
For system management: sudo, systemctl, top, ps, ifconfig
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.
It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.
Line balancing can help reduce production costs, increase output, and improve quality.
Examples of line balancing techniques include time stud...
Manpower allocation is based on project requirements, skill sets, availability, and workload.
Manpower allocation is a crucial aspect of production engineering.
It involves identifying the required skill sets for a project.
Availability of resources is also taken into consideration.
Workload is another factor that determines manpower allocation.
The allocation process is dynamic and can change based on project progress and
Top trending discussions
The duration of Kyungshin Industrial Motherson interview process can vary, but typically it takes about less than 2 weeks to complete.
Interview experience
based on 326 reviews
Rating in categories
Assistant Engineer
392
salaries
| ₹1 L/yr - ₹5 L/yr |
Junior Engineer
185
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Engineer
116
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Quality Engineer
80
salaries
| ₹1.4 L/yr - ₹4.8 L/yr |
Graduate Engineer Trainee (Get)
67
salaries
| ₹1.2 L/yr - ₹3 L/yr |
UNO Minda
TVS Sundram Fasteners
Bharat Forge
Endurance Technologies