Filter interviews by
The least count of a Vernier scale is the smallest measurement that can be read on the scale.
The least count is determined by the difference between the smallest division on the main scale and the smallest division on the Vernier scale.
It is usually expressed in the same units as the scale, such as millimeters or inches.
For example, if the smallest division on the main scale is 1 mm and the smallest division on the Ver...
Top trending discussions
posted on 18 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 3 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
posted on 28 Jan 2025
posted on 16 Sep 2024
Transformation in operations scaleup can be achieved through strategic planning, process optimization, technology integration, and continuous improvement.
Develop a comprehensive strategic plan outlining goals, objectives, and key performance indicators for the scaleup process.
Optimize existing processes to eliminate inefficiencies and streamline operations for increased productivity.
Integrate technology solutions such ...
My expected salary is negotiable and dependent on the overall compensation package offered.
I am open to discussing salary based on the responsibilities and benefits provided in the role.
I am looking for a competitive salary that aligns with industry standards and my level of experience.
I am also interested in opportunities for performance-based bonuses or incentives.
I am flexible and willing to consider different compe...
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
Production targets are set goals for the quantity and quality of products to be produced within a specific timeframe.
Production targets are typically set based on market demand, available resources, and production capacity.
Targets should be realistic, achievable, and aligned with overall business objectives.
Regular monitoring and adjustment of targets may be necessary to ensure optimal production efficiency.
Examples: S...
What is the Zeto rule of the company?
posted on 25 Oct 2024
posted on 20 Sep 2024
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
Kleanchute installation involves implementing waste disposal systems in residential apartments.
Consider the layout and size of the apartments to determine the best placement for Kleanchutes.
Ensure proper ventilation and safety measures are in place during installation.
Train residents on how to use the Kleanchute system effectively to avoid blockages or malfunctions.
A siphonic drainage system is a type of drainage system that uses the siphonic action to quickly remove large volumes of water from a building or area.
Utilizes the siphonic action to create a vacuum and rapidly drain water
Ideal for areas with high rainfall or where large volumes of water need to be removed quickly
Requires fewer and smaller pipes compared to traditional drainage systems
Commonly used in commercial buildi
based on 4 interviews
Interview experience
based on 65 reviews
Rating in categories
Quality Engineer
29
salaries
| ₹2 L/yr - ₹4 L/yr |
Executive Accountant
10
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Production Engineer
10
salaries
| ₹2.6 L/yr - ₹4.3 L/yr |
QA Engineer
8
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Tool Room Engineer
7
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
ABC Bearings
Bharat Gears
ELGI Equipments
Havells