Upload Button Icon Add office photos

Filter interviews by

KEPCO Plant Service & Engineering Interview Questions and Answers

Updated 26 Jan 2025

KEPCO Plant Service & Engineering Interview Experiences

Popular Designations

15 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Boiler, Turbine Emergency,plant heat rate, Boiler losses
Round 3 - HR 

(1 Question)

  • Q1. Package negotiation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. Financial and Accounts
  • Q2. Related to bank

Interview Preparation Tips

Interview preparation tips for other job seekers - Timely works and ready for works

Accounts & Finance Manager Interview Questions asked at other Companies

Q1. If any one invest their money in a company (debture). Then what get he or she from the company?
View answer (3)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Turbine overaulling & operation
  • Q2. Pump servicing & working
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation & experience
  • Q2. Family related insurance policies

Interview Preparation Tips

Interview preparation tips for other job seekers - Good technical knowledge

Senior Mechanical Maintenance Engineer Interview Questions asked at other Companies

Q1. What is the procedure for correct the miss alignment in gear box to motor
View answer (1)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Overall plant operation, emergency handlings and equipment protections. Etc.
Round 2 - HR 

(1 Question)

  • Q1. About ourselfs, salary negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong in technical

Deputy Manager Operations Interview Questions asked at other Companies

Q1. How do you ease out process of opening a bank account.
View answer (3)

KEPCO Plant Service & Engineering interview questions for popular designations

 Assistant Manager

 (2)

 Deputy Manager

 (2)

 Electrical Maintenance Engineer

 (1)

 Accounts & Finance Manager

 (1)

 Assistant Engineer

 (1)

 Senior Engineer

 (1)

 Mechanical Engineer

 (1)

 India Operations Manager

 (1)

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Turbine and Boiler interlock.
  • Q2. Turbine and Boiler light up procedure
  • Ans. 

    Turbine and Boiler light up procedure

    • Check all valves and switches are in the correct position

    • Check fuel and water levels

    • Start the boiler and wait for steam pressure to build up

    • Open the turbine inlet valve and gradually increase load

    • Monitor all parameters and adjust as necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BOILER and turbine good knowledge and plant light up and shutdown procedure.

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What are you doing at your past company
  • Q2. Salary how much you want😊
  • Q3. Why you want to join our company
  • Q4. Are you dedicated with your work
  • Q5. Are you technically sound

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz send your resume and give your interview confidently

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Assistant Engineer Interview Questions & Answers

user image vivek khajuriye

posted on 28 Jul 2022

I applied via LinkedIn and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

CFBC Boiler related questions

Interview Preparation Tips

Topics to prepare for KEPCO Plant Service & Engineering Assistant Engineer interview:
  • Boiler Operations
Interview preparation tips for other job seekers - CFBC Boiler good knowledge and experience, Emergency handling boiler

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Professional experience, technical question related to field.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident& relax, No need to worry

Electrical Maintenance Engineer Interview Questions asked at other Companies

Q1. Is that you know Digital Multimeter? Show me how to use for different components. They provided me HV diode, HV capacitor, Industrial X'mer etc
View answer (2)

Interview Questionnaire 

1 Question

  • Q1. Tc/rtd,Vib sensor, gap voltage basic instrumentation that's all followed by a English test

Interview Preparation Tips

Interview preparation tips for other job seekers - never join kepco kps if you are planning to move out of your home country very worst Company in terms of ethics,language they feel like except Korean all are slave if you r from india,Pakistan,Nepal,Philippines,
Taiwan,Uganda,Nigeria etc.I would suggest never join kepco kps.

Instrumentation Maintenance Engineer Interview Questions asked at other Companies

Q1. Defined your KRA that you are assigned in VECV ?
View answer (1)

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Work related to experience,skills and key performance
  • Ans. Whatever i have worked in industry and related equipment and there performance and parameters deeply and thoroughly.
  • Answered Anonymously
  • Q2. Key performance of coal handling system like equipment availability, equipment running hrs., rake delay,belt utilisation factor,safety and fire system.
  • Q3. It should be very clear and authentic as i have given him exact data because i was one who monitor these all continuosly.

Interview Preparation Tips

Interview preparation tips for other job seekers - always shows your strength and communication should be very clear and effective.

India Operations Manager Interview Questions asked at other Companies

Q1. There is an amoeba which is doubling his size in every minute. If the size of amoeba was equal to a box at 7 PM then at what time it was half of the box?
View answer (2)

I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All questions related to field and DCS

Interview Preparation Tips

Interview preparation tips for other job seekers - Just give basic knowledge, if you don't know. Just tell them.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)

KEPCO Plant Service & Engineering Interview FAQs

How many rounds are there in KEPCO Plant Service & Engineering interview?
KEPCO Plant Service & Engineering interview process usually has 2-3 rounds. The most common rounds in the KEPCO Plant Service & Engineering interview process are Technical, Resume Shortlist and HR.
How to prepare for KEPCO Plant Service & Engineering interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEPCO Plant Service & Engineering. The most common topics and skills that interviewers at KEPCO Plant Service & Engineering expect are thermal power plant, SAP, Training, Maintenance and Cooling Tower.
What are the top questions asked in KEPCO Plant Service & Engineering interview?

Some of the top questions asked at the KEPCO Plant Service & Engineering interview -

  1. All major BTG protection (Boiler/Turbine/Generator/Switchya...read more
  2. Turbine and Boiler light up proced...read more
  3. It should be very clear and authentic as i have given him exact data because i ...read more

Tell us how to improve this page.

KEPCO Plant Service & Engineering Interview Process

based on 9 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Thermax Limited Interview Questions
4.1
 • 249 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KEPCO Plant Service & Engineering Reviews and Ratings

based on 276 reviews

3.7/5

Rating in categories

3.5

Skill development

3.4

Work-life balance

3.5

Salary

3.3

Job security

3.4

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 276 Reviews and Ratings
Assistant Engineer
93 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
90 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
73 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
72 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KEPCO Plant Service & Engineering with

L&T Energy Hydrocarbon

3.8
Compare

Tata Projects

4.2
Compare

TechnipFMC

4.0
Compare

Toyo Engineering

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview