Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KMV Projects Limited Team. If you also belong to the team, you can get access from here

KMV Projects Limited Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KMV Projects Limited Graduate Engineer Trainee (Get) Interview Questions and Answers

Updated 8 Nov 2019

KMV Projects Limited Graduate Engineer Trainee (Get) Interview Experiences

1 interview found

I applied via Referral and was interviewed before Nov 2018. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell about your b.tech project ?2.why study civil engineering ?3.what is uses of civil engineering? 4.tell types of cement ? 5.what is steel rate &ce...

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview done in Telugu language&only 1panal member(above AGM level).call for interview only 1:1 ratio.
After interview wait 7days.joining order is given&travelling tickets are provide for site location.

Interview questions from similar companies

I appeared for an interview in Aug 2016.

Interview Preparation Tips

Round: Test
Duration: 1 hour 30 minutes
Total Questions: 90

Round: Group Discussion
Duration: 20 minutes

Round: Technical + HR Interview
Experience: 1-There was only 1 Interview round.
An employer form was given one day before interview along with an extra paper containing question about what Functional area(production, quality, design, R&D) will u prefer after going to company and why.
2-HR part-
A)-First question was to introduce yourself.
I have answered it and ended it by telling my strength as Pre- planning and time management.
Then they asked me to prove how I have pre planned before coming to interview.
B)-Then other questions related to hobbies and extra-curricular.
In answer to this question I have given the brief overview of all the events and activities in which I have participated.
C)-I have written in my CV writing poem as a hobby, then they told me to narrate few lines of poem.
D)-Then they asked anything recently I have learnt.
In answer to this I have told about my recent summer internships and project allotted there.
E)-They said functional area provided will be according to company requirement. Then I said OK I am comfortable with all departments but I will prefer that dept. which I have filled in the form.
3)-Technical part-
A)-At first they have asked about my projects done under professors.
B)-Then they asked about my FINAL year project I explained it until they said OK. to stop it.
C)-Then they come to AOI(Area of Interest) part.
D)-They asked about why piston up surface shapes (convex/concave) used in 2 stroke and 4 stroke engines?
E)-Then They asked to draw 2 stroke engine with explaining all its parts and working.
F)-Next question was to explain Straight polarity and Reverse polarity in Welding, its uses and basic concept.
G)-Then they asked about Facing operation in lathe whether it can be performed for square cross-section bars or not?
I have answered this question as yes it can be performed but there will be more vibrations and noise; So more lubrication will be required hence cost to make per product will increase that is loss for the company. So it is not performed usually
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Relevant to all subject it is normal paper.
Round 3 - HR 

(1 Question)

  • Q1. Relevant to your past and future ahead.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep studying until you get a job..I think you don't Give to the chance most precious one....

I applied via Campus Placement

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Designing of beams, steel designing
  • Q2. SFD BMD AND ENVIRONMENT ENGINEERING
Round 3 - HR 

(2 Questions)

  • Q1. About intership, LIKE HOW U TACKLE WITH UNEDUCATED WORKFORCE
  • Q2. GRADES IS LOWER.. LIKE UR GRADES ARE LOWERING DAY BY DAY

Interview Preparation Tips

Interview preparation tips for other job seekers - U should have a good hod on your core knowledge for Samsung engineering
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Objective Questions asked based on the civil domain
Round 2 - One-on-one 

(2 Questions)

  • Q1. Question from cv
  • Q2. Calculate weight of steel plate, dimension given
  • Ans. 

    Calculate weight of steel plate based on given dimensions

    • Calculate the volume of the steel plate using the given dimensions

    • Use the density of steel (usually around 7850 kg/m^3) to calculate the weight

    • Weight = Volume x Density

  • Answered by AI
Round 1 - Aptitude Test 

30 minutes, Aptitude and Technical

Round 2 - HR 

(3 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. What are your strengths and weaknesses?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and research about the company first

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,

Tell us how to improve this page.

KMV Projects Limited Graduate Engineer Trainee (Get) Salary
based on 20 salaries
₹1.1 L/yr - ₹3 L/yr
35% less than the average Graduate Engineer Trainee (Get) Salary in India
View more details

KMV Projects Limited Graduate Engineer Trainee (Get) Reviews and Ratings

based on 5 reviews

3.2/5

Rating in categories

2.9

Skill development

1.9

Work-life balance

2.5

Salary

2.2

Job security

2.6

Company culture

2.2

Promotions

2.2

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Engineer
147 salaries
unlock blur

₹2.1 L/yr - ₹5.8 L/yr

Engineer
75 salaries
unlock blur

₹3.4 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
63 salaries
unlock blur

₹1.9 L/yr - ₹5.5 L/yr

Senior Engineer
47 salaries
unlock blur

₹4.8 L/yr - ₹9.6 L/yr

Civil Site Engineer
46 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare KMV Projects Limited with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview