Upload Button Icon Add office photos

Filter interviews by

KLC CONSTRUCTION Interview Questions, Process, and Tips

Updated 21 Mar 2025

Top KLC CONSTRUCTION Interview Questions and Answers

View all 8 questions

KLC CONSTRUCTION Interview Experiences

Popular Designations

6 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Structure, mivan Bbs contractor handle etc.
  • Q2. Bbs Mivan shuttering heigh-Rise building Structure work.
  • Q3. Tell me spacer bar minimum dia of bar and how many distance provided.
  • Ans. 

    Spacer bar minimum diameter and spacing requirements vary depending on the application and building codes.

    • Spacer bar minimum diameter is typically around 6mm to 8mm for single glazing and 10mm to 12mm for double glazing.

    • Spacing between spacer bars is usually between 8mm to 20mm, depending on the size of the glass pane and thermal insulation requirements.

    • Building codes may specify specific requirements for spacer bar di...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KLC CONSTRUCTION Senior Engineer interview:
  • 1) Mivan
  • Infrastructure
  • Bbs
Interview preparation tips for other job seekers - Perfect knowledge mivan shuttering
Bbs and structure work.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About RCC structures, Asked About Previous Employment History
  • Q2. Family History

General Manager and Project Head Interview Questions asked at other Companies

Q1. Specific consumption of raw materials & cost.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Mivan shuttering
  • Q2. Conventional slab

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Whag is budget and costing.
  • Ans. 

    Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.

    • Budget is a plan that outlines the expected income and expenses for a specific period.

    • Costing involves estimating the expenses of a project or product, including direct and indirect costs.

    • Budgeting and costing are important for businesses to ensure financial stability and profitability.

    • Exampl...

  • Answered by AI
  • Q2. Do you know schedule and ms project.
  • Q3. How to do scheduling.
  • Ans. 

    Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.

    • Identify the tasks or projects that need to be completed

    • Determine the resources needed for each task or project

    • Estimate the time required to complete each task or project

    • Create a schedule that allocates resources and time to each task or project

    • Monitor progress and adjust the schedule as needed

  • Answered by AI
  • Q4. What is the rate of per square feet.
  • Ans. 

    The rate of per square feet varies depending on the location, type of property, and other factors.

    • The rate of per square feet is not a fixed value and varies from property to property.

    • Factors such as location, type of property, amenities, and market demand can affect the rate.

    • For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...

  • Answered by AI
  • Q5. How to do planning amd estimati g.
  • Ans. 

    Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.

    • Identify all tasks required to complete the project

    • Set realistic timelines for each task

    • Determine the resources needed for each task

    • Consider potential risks and contingencies

    • Regularly review and adjust the plan as needed

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare technical. For salary round they are fixed on the package.

Skills evaluated in this interview

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

KLC CONSTRUCTION interview questions for popular designations

 Planning Manager

 (2)

 General Manager and Project Head

 (1)

 Senior Engineer

 (1)

 Senior Civil Engineer

 (1)

 Store Incharge

 (1)

Planning Manager Interview Questions & Answers

user image Mohd Faisal Afatab

posted on 9 Jun 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Do you know BBS
  • Ans. 

    Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.

    • BBS involves observing and analyzing employee behaviors to identify potential safety hazards

    • It aims to change unsafe behaviors through training, feedback, and reinforcement

    • Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive

  • Answered by AI
  • Q2. Do you know about project planning and how do you plan
  • Q3. Project budgeting
  • Q4. Project costing
  • Q5. Resources planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Well prepared for interview with all respect of term of planning perpose

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. How relevent your previous work experience
  • Q2. How to maintain store stock available
  • Ans. 

    To maintain store stock availability, it is important to implement effective inventory management practices.

    • Regularly monitor stock levels and reorder items as needed

    • Implement a first-in, first-out (FIFO) system to ensure older stock is sold first

    • Use inventory management software to track stock levels and automate reordering

    • Conduct regular stock audits to identify discrepancies and prevent stockouts

    • Establish good relat...

  • Answered by AI
  • Q3. How much your expectations
  • Q4. My real experience with increment
  • Ans. 

    I have received increments based on my performance and achievements.

    • I have received increments in my previous job for meeting and exceeding sales targets.

    • My increment was based on my performance appraisal and feedback from my manager.

    • I have also received increments for taking up additional responsibilities and completing projects ahead of schedule.

    • In my experience, increments are a reflection of the value an employee b

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Share what you really do upto now and future

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2018. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions related to current project works.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Relevant criteria and relevant experience

Round: Client interview
Experience: Client

I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How much Construction tolerance for NATM tunneling
  • Ans. 

    Construction tolerance for NATM tunneling depends on various factors.

    • The type of rock or soil being excavated

    • The size and shape of the tunnel

    • The depth of the tunnel

    • The presence of water or other geological features

    • Typically, a tolerance of +/- 50mm is used for NATM tunneling

    • However, this can vary depending on the specific project and site conditions

  • Answered by AI
  • Q2. Principle of NATM tunneling
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a principle of tunneling that involves excavation and support in a sequential manner.

    • Excavation and support are done in a sequential manner

    • The method is flexible and adaptable to different geological conditions

    • It involves the use of shotcrete and rock bolts for support

    • The principle was developed in Austria in the 1950s and has since been used worldwide

    • Examples of NATM tunn...

  • Answered by AI
  • Q3. About Major material reconciliation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare before interview with Past experience work carried out during your services with indivdual role.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Costing - Zero Budget Preparation
  • Q2. Scheduling - Type of Software’s used
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Job Portal and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Technical Questions
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation

KLC CONSTRUCTION Interview FAQs

How many rounds are there in KLC CONSTRUCTION interview?
KLC CONSTRUCTION interview process usually has 1-2 rounds. The most common rounds in the KLC CONSTRUCTION interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in KLC CONSTRUCTION interview?

Some of the top questions asked at the KLC CONSTRUCTION interview -

  1. Tell me spacer bar minimum dia of bar and how many distance provid...read more
  2. How to do planning amd estimati...read more
  3. How to maintain store stock availa...read more

Tell us how to improve this page.

KLC CONSTRUCTION Interview Process

based on 6 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 446 Interviews
KEC International Interview Questions
4.0
 • 308 Interviews
Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
View all

KLC CONSTRUCTION Reviews and Ratings

based on 77 reviews

3.9/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.8

Salary

3.3

Job security

3.5

Company culture

3.6

Promotions

3.7

Work satisfaction

Explore 77 Reviews and Ratings
Safety Officer
28 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Civil Site Engineer
27 salaries
unlock blur

₹1.7 L/yr - ₹5 L/yr

Site Engineer
20 salaries
unlock blur

₹1.5 L/yr - ₹5.1 L/yr

Senior Engineer
18 salaries
unlock blur

₹3.6 L/yr - ₹7.6 L/yr

Junior Engineer
11 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare KLC CONSTRUCTION with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview