Filter interviews by
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Spacer bar minimum diameter and spacing requirements vary depending on the application and building codes.
Spacer bar minimum diameter is typically around 6mm to 8mm for single glazing and 10mm to 12mm for double glazing.
Spacing between spacer bars is usually between 8mm to 20mm, depending on the size of the glass pane and thermal insulation requirements.
Building codes may specify specific requirements for spacer bar di...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.
Budget is a plan that outlines the expected income and expenses for a specific period.
Costing involves estimating the expenses of a project or product, including direct and indirect costs.
Budgeting and costing are important for businesses to ensure financial stability and profitability.
Exampl...
Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.
Identify the tasks or projects that need to be completed
Determine the resources needed for each task or project
Estimate the time required to complete each task or project
Create a schedule that allocates resources and time to each task or project
Monitor progress and adjust the schedule as needed
The rate of per square feet varies depending on the location, type of property, and other factors.
The rate of per square feet is not a fixed value and varies from property to property.
Factors such as location, type of property, amenities, and market demand can affect the rate.
For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...
Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.
Identify all tasks required to complete the project
Set realistic timelines for each task
Determine the resources needed for each task
Consider potential risks and contingencies
Regularly review and adjust the plan as needed
KLC CONSTRUCTION interview questions for popular designations
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
BBS involves observing and analyzing employee behaviors to identify potential safety hazards
It aims to change unsafe behaviors through training, feedback, and reinforcement
Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
To maintain store stock availability, it is important to implement effective inventory management practices.
Regularly monitor stock levels and reorder items as needed
Implement a first-in, first-out (FIFO) system to ensure older stock is sold first
Use inventory management software to track stock levels and automate reordering
Conduct regular stock audits to identify discrepancies and prevent stockouts
Establish good relat...
I have received increments based on my performance and achievements.
I have received increments in my previous job for meeting and exceeding sales targets.
My increment was based on my performance appraisal and feedback from my manager.
I have also received increments for taking up additional responsibilities and completing projects ahead of schedule.
In my experience, increments are a reflection of the value an employee b
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2018. There were 5 interview rounds.
I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.
Construction tolerance for NATM tunneling depends on various factors.
The type of rock or soil being excavated
The size and shape of the tunnel
The depth of the tunnel
The presence of water or other geological features
Typically, a tolerance of +/- 50mm is used for NATM tunneling
However, this can vary depending on the specific project and site conditions
NATM stands for New Austrian Tunneling Method, a principle of tunneling that involves excavation and support in a sequential manner.
Excavation and support are done in a sequential manner
The method is flexible and adaptable to different geological conditions
It involves the use of shotcrete and rock bolts for support
The principle was developed in Austria in the 1950s and has since been used worldwide
Examples of NATM tunn...
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Job Portal and was interviewed in Nov 2024. There were 3 interview rounds.
based on 6 interviews
Interview experience
based on 77 reviews
Rating in categories
Safety Officer
28
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Civil Site Engineer
27
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Site Engineer
20
salaries
| ₹1.5 L/yr - ₹5.1 L/yr |
Senior Engineer
18
salaries
| ₹3.6 L/yr - ₹7.6 L/yr |
Junior Engineer
11
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures