Upload Button Icon Add office photos

Filter interviews by

KLC CONSTRUCTION Interview Questions, Process, and Tips

Updated 17 Mar 2024

Top KLC CONSTRUCTION Interview Questions and Answers

View all 8 questions

KLC CONSTRUCTION Interview Experiences

Popular Designations

4 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Structure, mivan Bbs contractor handle etc.
  • Q2. Bbs Mivan shuttering heigh-Rise building Structure work.
  • Q3. Tell me spacer bar minimum dia of bar and how many distance provided.
  • Ans. 

    Spacer bar minimum diameter and spacing requirements vary depending on the application and building codes.

    • Spacer bar minimum diameter is typically around 6mm to 8mm for single glazing and 10mm to 12mm for double glazing.

    • Spacing between spacer bars is usually between 8mm to 20mm, depending on the size of the glass pane and thermal insulation requirements.

    • Building codes may specify specific requirements for spacer bar di...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KLC CONSTRUCTION Senior Engineer interview:
  • 1) Mivan
  • Infrastructure
  • Bbs
Interview preparation tips for other job seekers - Perfect knowledge mivan shuttering
Bbs and structure work.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Whag is budget and costing.
  • Ans. 

    Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.

    • Budget is a plan that outlines the expected income and expenses for a specific period.

    • Costing involves estimating the expenses of a project or product, including direct and indirect costs.

    • Budgeting and costing are important for businesses to ensure financial stability and profitability.

    • Exampl...

  • Answered by AI
  • Q2. Do you know schedule and ms project.
  • Q3. How to do scheduling.
  • Ans. 

    Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.

    • Identify the tasks or projects that need to be completed

    • Determine the resources needed for each task or project

    • Estimate the time required to complete each task or project

    • Create a schedule that allocates resources and time to each task or project

    • Monitor progress and adjust the schedule as needed

  • Answered by AI
  • Q4. What is the rate of per square feet.
  • Ans. 

    The rate of per square feet varies depending on the location, type of property, and other factors.

    • The rate of per square feet is not a fixed value and varies from property to property.

    • Factors such as location, type of property, amenities, and market demand can affect the rate.

    • For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...

  • Answered by AI
  • Q5. How to do planning amd estimati g.
  • Ans. 

    Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.

    • Identify all tasks required to complete the project

    • Set realistic timelines for each task

    • Determine the resources needed for each task

    • Consider potential risks and contingencies

    • Regularly review and adjust the plan as needed

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare technical. For salary round they are fixed on the package.

Skills evaluated in this interview

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

Planning Manager Interview Questions & Answers

user image Mohd Faisal Afatab

posted on 9 Jun 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Do you know BBS
  • Ans. 

    Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.

    • BBS involves observing and analyzing employee behaviors to identify potential safety hazards

    • It aims to change unsafe behaviors through training, feedback, and reinforcement

    • Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive

  • Answered by AI
  • Q2. Do you know about project planning and how do you plan
  • Q3. Project budgeting
  • Q4. Project costing
  • Q5. Resources planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Well prepared for interview with all respect of term of planning perpose

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. How relevent your previous work experience
  • Q2. How to maintain store stock available
  • Ans. 

    To maintain store stock availability, it is important to implement effective inventory management practices.

    • Regularly monitor stock levels and reorder items as needed

    • Implement a first-in, first-out (FIFO) system to ensure older stock is sold first

    • Use inventory management software to track stock levels and automate reordering

    • Conduct regular stock audits to identify discrepancies and prevent stockouts

    • Establish good relat...

  • Answered by AI
  • Q3. How much your expectations
  • Q4. My real experience with increment
  • Ans. 

    I have received increments based on my performance and achievements.

    • I have received increments in my previous job for meeting and exceeding sales targets.

    • My increment was based on my performance appraisal and feedback from my manager.

    • I have also received increments for taking up additional responsibilities and completing projects ahead of schedule.

    • In my experience, increments are a reflection of the value an employee b

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Share what you really do upto now and future

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

KLC CONSTRUCTION interview questions for popular designations

 Planning Manager

 (2)

 Senior Engineer

 (1)

 Store Incharge

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Diesel Generator: A Reliable Power Source
A diesel generator is a self-contained power generating unit that combines a diesel engine with an electric generator (often an alternator). It's a versatile and widely used source of electricity, particularly in situations where a reliable power supply is crucial.
How Diesel Generators Work
* Diesel Engine: The diesel engine, fueled by diesel fuel, acts as the prime mover. It converts the chemical energy of the fuel into mechanical energy through combustion.
* Electric Generator: The mechanical energy from the engine is transferred to the generator, which converts it into electrical energy. This electrical energy can then be used to power various appliances and equipment.
Applications of Diesel Generators
* Backup Power: Diesel generators are commonly used as backup power sources for homes, businesses, hospitals, and critical infrastructure during power outages.
* Remote Locations: In areas with limited or no access to the grid, diesel generators provide a reliable source of electricity for various applications.
* Construction Sites: Diesel generators power tools and equipment on construction sites, ensuring work can continue even in remote locations.
* Off-Grid Living: Individuals living off the grid often rely on diesel generators for their electricity needs.
* Data Centers: Diesel generators provide backup power to ensure the continuous operation of critical data centers.
Advantages of Diesel Generators
* Reliability: Diesel engines are known for their durability and reliability, making them suitable for demanding applications.
* Fuel Efficiency: Modern diesel engines offer excellent fuel efficiency, reducing operating costs.
* Wide Power Range: Diesel generators are available in a wide range of sizes and power capacities, catering to various needs.
* Easy Maintenance: Diesel generators are relatively easy to maintain and service.
Disadvantages of Diesel Generators
* Noise: Diesel generators can be noisy, which may be a concern in certain settings.

Round 2 - One-on-one 

(3 Questions)

  • Q1. Transformer & protection
  • Q2. Breaker & protection
  • Q3. Motor panel Feeder & protection
Round 3 - One-on-one 

(2 Questions)

  • Q1. Motor & Motor protection
  • Q2. All types panel & protection
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. The Electrical technician job description entails participating in independent maintenance related training activities organized by the field operations teams and coordinating shutdowns to ensure that ...
  • Q2. Commercial and Industrial Electrical Maintenance is the process of regularly inspecting, testing, cleaning, and repairing electrical systems and components to ensure they are safe and functioning Prope...
  • Q3. The technician’s role also includes participating in planning, ensuring effective spare parts management, and supervising continuous project improvement.
  • Q4. Electrical technicians perform various functions, depending on the particular operations of the company or organization they work with. However, their role is majorly to ensure effective repairs and mainte...

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical safety
Power suppliers
Electrical troubleshooting
PLC Electrical control panel
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What are the standards for scaffolding codes?
  • Q2. What are the different types of scaffolding erection?
  • Q3. What type of use material for safety purchase
  • Q4. How to safe Erection
  • Q5. Identify risk and hazard

Interview Preparation Tips

Interview preparation tips for other job seekers - We are erecting scaffolding according to the company's standards.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(5 Questions)

  • Q1. My Experience is good and best Experience this this my problem is company dropuot , My interview this HR.and CEO. BM .and Accounted this all company best Experience members this me interview show That is ...
  • Q2. Company manufacturing work this BHEL part and CGL part working this manufacturing company
  • Q3. What is skill? Ans:- MS word ms excel and telly knowledge all store keepers knowledge
  • Q4. What this professional and personal? Ans:-I am work times professional and that is work out time personal
  • Q5. What did you house? Working side areas areng
  • Ans. 

    I managed inventory of various items in the store, including working side areas.

    • Managed inventory of products and supplies

    • Organized and maintained stock levels

    • Handled incoming and outgoing shipments

    • Ensured proper storage and labeling of items

    • Performed regular inventory checks and audits

  • Answered by AI

Deputy Regional Planning Manager Interview Questions & Answers

Shapoorji Pallonji Group user image Anonymous

posted on 7 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - Technical 

(10 Questions)

  • Q1. Brief about your education, career, previous projects handled, and role & responsibility in past organisations?
  • Q2. Current roles & responsibilities and value addition done by you and your team?
  • Q3. Process flow for planning throughout project life-cycle?
  • Q4. Critical/concerning areas to be monitored?
  • Q5. Productivity and permissible material wastage, process to prepare material reconciliation?
  • Q6. Understanding about claim and type of claim raised/supported to raise in past experience?
  • Q7. Experience of technical aspects and planning assessment required at tendering stage, capabilities to prepare tender submittals and proving insights to management on same?
  • Q8. Necessity of providing PMO support to management?
  • Q9. Understanding about role & responsibility of regional planning manager?
  • Q10. MIS and type of reports prepared in past and their significance for Top managemennt?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop

KLC CONSTRUCTION Interview FAQs

How many rounds are there in KLC CONSTRUCTION interview?
KLC CONSTRUCTION interview process usually has 1-2 rounds. The most common rounds in the KLC CONSTRUCTION interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in KLC CONSTRUCTION interview?

Some of the top questions asked at the KLC CONSTRUCTION interview -

  1. Tell me spacer bar minimum dia of bar and how many distance provid...read more
  2. How to do planning amd estimati...read more
  3. How to maintain store stock availa...read more

Tell us how to improve this page.

KLC CONSTRUCTION Interview Process

based on 4 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 413 Interviews
GMR Group Interview Questions
4.1
 • 77 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KLC CONSTRUCTION Reviews and Ratings

based on 70 reviews

3.9/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.6

Salary

3.4

Job security

3.6

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 70 Reviews and Ratings
Civil Site Engineer
27 salaries
unlock blur

₹1.7 L/yr - ₹5 L/yr

Safety Officer
23 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Site Engineer
20 salaries
unlock blur

₹1.5 L/yr - ₹5.1 L/yr

Senior Engineer
19 salaries
unlock blur

₹3.6 L/yr - ₹7.6 L/yr

Junior Engineer
10 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Explore more salaries
Compare KLC CONSTRUCTION with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview