Filter interviews by
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Spacer bar minimum diameter and spacing requirements vary depending on the application and building codes.
Spacer bar minimum diameter is typically around 6mm to 8mm for single glazing and 10mm to 12mm for double glazing.
Spacing between spacer bars is usually between 8mm to 20mm, depending on the size of the glass pane and thermal insulation requirements.
Building codes may specify specific requirements for spacer bar di...
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.
Budget is a plan that outlines the expected income and expenses for a specific period.
Costing involves estimating the expenses of a project or product, including direct and indirect costs.
Budgeting and costing are important for businesses to ensure financial stability and profitability.
Exampl...
Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.
Identify the tasks or projects that need to be completed
Determine the resources needed for each task or project
Estimate the time required to complete each task or project
Create a schedule that allocates resources and time to each task or project
Monitor progress and adjust the schedule as needed
The rate of per square feet varies depending on the location, type of property, and other factors.
The rate of per square feet is not a fixed value and varies from property to property.
Factors such as location, type of property, amenities, and market demand can affect the rate.
For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...
Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.
Identify all tasks required to complete the project
Set realistic timelines for each task
Determine the resources needed for each task
Consider potential risks and contingencies
Regularly review and adjust the plan as needed
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
BBS involves observing and analyzing employee behaviors to identify potential safety hazards
It aims to change unsafe behaviors through training, feedback, and reinforcement
Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive
KLC CONSTRUCTION interview questions for popular designations
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
To maintain store stock availability, it is important to implement effective inventory management practices.
Regularly monitor stock levels and reorder items as needed
Implement a first-in, first-out (FIFO) system to ensure older stock is sold first
Use inventory management software to track stock levels and automate reordering
Conduct regular stock audits to identify discrepancies and prevent stockouts
Establish good relat...
I have received increments based on my performance and achievements.
I have received increments in my previous job for meeting and exceeding sales targets.
My increment was based on my performance appraisal and feedback from my manager.
I have also received increments for taking up additional responsibilities and completing projects ahead of schedule.
In my experience, increments are a reflection of the value an employee b
I applied via Naukri.com and was interviewed in Jan 2018. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
posted on 10 May 2024
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.
Planning is the process of setting goals and determining the actions needed to achieve those goals.
Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.
Tactical plans are medium-term pla...
posted on 30 Jun 2023
I applied via Referral and was interviewed in May 2023. There was 1 interview round.
based on 5 interviews
Interview experience
based on 74 reviews
Rating in categories
Civil Site Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd