Upload Button Icon Add office photos

Filter interviews by

KLC CONSTRUCTION Interview Questions, Process, and Tips

Updated 2 Feb 2025

Top KLC CONSTRUCTION Interview Questions and Answers

View all 8 questions

KLC CONSTRUCTION Interview Experiences

Popular Designations

5 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About RCC structures, Asked About Previous Employment History
  • Q2. Family History

General Manager and Project Head Interview Questions asked at other Companies

Q1. Specific consumption of raw materials & cost.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Structure, mivan Bbs contractor handle etc.
  • Q2. Bbs Mivan shuttering heigh-Rise building Structure work.
  • Q3. Tell me spacer bar minimum dia of bar and how many distance provided.
  • Ans. 

    Spacer bar minimum diameter and spacing requirements vary depending on the application and building codes.

    • Spacer bar minimum diameter is typically around 6mm to 8mm for single glazing and 10mm to 12mm for double glazing.

    • Spacing between spacer bars is usually between 8mm to 20mm, depending on the size of the glass pane and thermal insulation requirements.

    • Building codes may specify specific requirements for spacer bar di...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KLC CONSTRUCTION Senior Engineer interview:
  • 1) Mivan
  • Infrastructure
  • Bbs
Interview preparation tips for other job seekers - Perfect knowledge mivan shuttering
Bbs and structure work.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Whag is budget and costing.
  • Ans. 

    Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.

    • Budget is a plan that outlines the expected income and expenses for a specific period.

    • Costing involves estimating the expenses of a project or product, including direct and indirect costs.

    • Budgeting and costing are important for businesses to ensure financial stability and profitability.

    • Exampl...

  • Answered by AI
  • Q2. Do you know schedule and ms project.
  • Q3. How to do scheduling.
  • Ans. 

    Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.

    • Identify the tasks or projects that need to be completed

    • Determine the resources needed for each task or project

    • Estimate the time required to complete each task or project

    • Create a schedule that allocates resources and time to each task or project

    • Monitor progress and adjust the schedule as needed

  • Answered by AI
  • Q4. What is the rate of per square feet.
  • Ans. 

    The rate of per square feet varies depending on the location, type of property, and other factors.

    • The rate of per square feet is not a fixed value and varies from property to property.

    • Factors such as location, type of property, amenities, and market demand can affect the rate.

    • For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...

  • Answered by AI
  • Q5. How to do planning amd estimati g.
  • Ans. 

    Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.

    • Identify all tasks required to complete the project

    • Set realistic timelines for each task

    • Determine the resources needed for each task

    • Consider potential risks and contingencies

    • Regularly review and adjust the plan as needed

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare technical. For salary round they are fixed on the package.

Skills evaluated in this interview

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

Planning Manager Interview Questions & Answers

user image Mohd Faisal Afatab

posted on 9 Jun 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Do you know BBS
  • Ans. 

    Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.

    • BBS involves observing and analyzing employee behaviors to identify potential safety hazards

    • It aims to change unsafe behaviors through training, feedback, and reinforcement

    • Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive

  • Answered by AI
  • Q2. Do you know about project planning and how do you plan
  • Q3. Project budgeting
  • Q4. Project costing
  • Q5. Resources planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Well prepared for interview with all respect of term of planning perpose

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

KLC CONSTRUCTION interview questions for popular designations

 Planning Manager

 (2)

 General Manager and Project Head

 (1)

 Senior Engineer

 (1)

 Store Incharge

 (1)

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. How relevent your previous work experience
  • Q2. How to maintain store stock available
  • Ans. 

    To maintain store stock availability, it is important to implement effective inventory management practices.

    • Regularly monitor stock levels and reorder items as needed

    • Implement a first-in, first-out (FIFO) system to ensure older stock is sold first

    • Use inventory management software to track stock levels and automate reordering

    • Conduct regular stock audits to identify discrepancies and prevent stockouts

    • Establish good relat...

  • Answered by AI
  • Q3. How much your expectations
  • Q4. My real experience with increment
  • Ans. 

    I have received increments based on my performance and achievements.

    • I have received increments in my previous job for meeting and exceeding sales targets.

    • My increment was based on my performance appraisal and feedback from my manager.

    • I have also received increments for taking up additional responsibilities and completing projects ahead of schedule.

    • In my experience, increments are a reflection of the value an employee b

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Share what you really do upto now and future

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2018. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions related to current project works.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Relevant criteria and relevant experience

Round: Client interview
Experience: Client

I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How many years of experience you have? What is your responsibilities.
  • Q2. Which kind of projects have you done?

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your mind cool. Everything will be depending on your talent.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What are activities in toilet area
  • Ans. 

    Activities in toilet area include personal hygiene, using the toilet, and cleaning.

    • Personal hygiene activities such as washing hands, brushing teeth, and showering

    • Using the toilet for urination and defecation

    • Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash

    • Maintenance tasks like unclogging drains or fixing leaks

  • Answered by AI
  • Q2. How will you calculate %age of completion of project
  • Ans. 

    Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.

    • Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.

    • Alternatively, %age of completion can be determined by tracking completion of specific project milestones.

    • Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Plumbing work in wall and floor, wall plaster and then wall tile after that flooring
  • Ans. 

    The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.

    • Start by completing the plumbing work in the walls and floors

    • Next, apply wall plaster to smoothen the surface

    • Then, install wall tiles for a decorative finish

    • Finally, proceed with the flooring installation

  • Answered by AI
  • Q2. By EPC weightage %age
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Please introduce yourself
  • Q2. About your job experience
  • Q3. What do you understand by planning & different level of plans.
  • Ans. 

    Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.

    • Planning is the process of setting goals and determining the actions needed to achieve those goals.

    • Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.

    • Tactical plans are medium-term pla...

  • Answered by AI
  • Q4. Project specific questions
  • Q5. How early can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a browse through your experience mentioned on cv. Learn about company & it's past & recent projects
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Technical and experience based questions
  • Q2. Function related questions
  • Q3. Knowledge based
  • Q4. HR generally negotiate for salary
  • Q5. HR is flexible enough

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience and knowledgable skill person will get easily job

KLC CONSTRUCTION Interview FAQs

How many rounds are there in KLC CONSTRUCTION interview?
KLC CONSTRUCTION interview process usually has 1-2 rounds. The most common rounds in the KLC CONSTRUCTION interview process are One-on-one Round, Technical and Resume Shortlist.
What are the top questions asked in KLC CONSTRUCTION interview?

Some of the top questions asked at the KLC CONSTRUCTION interview -

  1. Tell me spacer bar minimum dia of bar and how many distance provid...read more
  2. How to do planning amd estimati...read more
  3. How to maintain store stock availa...read more

Tell us how to improve this page.

KLC CONSTRUCTION Interview Process

based on 5 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 427 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KLC CONSTRUCTION Reviews and Ratings

based on 74 reviews

3.8/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

3.7

Salary

3.2

Job security

3.5

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 74 Reviews and Ratings
Civil Site Engineer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
26 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KLC CONSTRUCTION with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview