I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Budget is a financial plan for a specific period while costing is the process of estimating the expenses of a project or product.
Budget is a plan that outlines the expected income and expenses for a specific period.
Costing involves estimating the expenses of a project or product, including direct and indirect costs.
Budgeting and costing are important for businesses to ensure financial stability and profitability.
Exampl...
Scheduling involves creating a plan for allocating resources and time to complete tasks or projects.
Identify the tasks or projects that need to be completed
Determine the resources needed for each task or project
Estimate the time required to complete each task or project
Create a schedule that allocates resources and time to each task or project
Monitor progress and adjust the schedule as needed
The rate of per square feet varies depending on the location, type of property, and other factors.
The rate of per square feet is not a fixed value and varies from property to property.
Factors such as location, type of property, amenities, and market demand can affect the rate.
For example, the rate of per square feet for a luxury apartment in a prime location will be higher than a standard apartment in a less desirable ...
Planning and estimating involves identifying tasks, setting timelines, and determining resource requirements.
Identify all tasks required to complete the project
Set realistic timelines for each task
Determine the resources needed for each task
Consider potential risks and contingencies
Regularly review and adjust the plan as needed
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
Yes, BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
BBS involves observing and analyzing employee behaviors to identify potential safety hazards
It aims to change unsafe behaviors through training, feedback, and reinforcement
Examples of BBS techniques include peer-to-peer observations, safety coaching, and safety incentive
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.
posted on 11 May 2018
posted on 12 Jul 2022
I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.
Computer aptitude test
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
posted on 14 Feb 2021
based on 1 interview
Interview experience
Safety Officer
28
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Civil Site Engineer
27
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Site Engineer
20
salaries
| ₹1.5 L/yr - ₹5.1 L/yr |
Senior Engineer
18
salaries
| ₹3.6 L/yr - ₹7.6 L/yr |
Junior Engineer
11
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures