Filter interviews by
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2023. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I expect the company to provide opportunities for growth, a positive work environment, and clear communication.
Opportunities for career advancement
Positive work culture
Clear communication channels
I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.
It is not appropriate to discuss previous salary in an interview
Focus on discussing the value you can bring to the company
Emphasize your skills, experience, and qualifications instead of past salary
posted on 3 Jan 2025
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
posted on 15 Mar 2024
I applied via Campus Placement
The stages of Project Lifecycle include initiation, planning, execution, monitoring and controlling, and closing.
Initiation: Define the project at a broad level and obtain approval to start.
Planning: Develop a roadmap for achieving the project goals.
Execution: Implement the plan and manage resources to complete the project.
Monitoring and Controlling: Track and review project progress to ensure it stays on track.
Closing...
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
posted on 21 Jan 2025
I was interviewed before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
How to save inventry cost
I applied via Walk-in and was interviewed before Nov 2022. There were 2 interview rounds.
The priority job of a control engineer is to design, implement, and maintain control systems for various applications.
Designing control systems to meet specific requirements
Implementing control algorithms to regulate processes
Maintaining and troubleshooting control systems to ensure optimal performance
Collaborating with other engineers and stakeholders to integrate control systems into larger systems
Staying updated on ...
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Account Assistant
4
salaries
| ₹2.4 L/yr - ₹3.1 L/yr |
Civil Engineer
4
salaries
| ₹2.6 L/yr - ₹6.6 L/yr |
Junior Site Engineer
4
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Assistant Manager
3
salaries
| ₹4.7 L/yr - ₹6 L/yr |
Engineer
3
salaries
| ₹4.2 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group