Baseline schedule is the original project schedule that serves as a reference point for measuring progress and performance.
Baseline schedule is the initial approved project schedule that includes planned start and end dates for each task.
It is used as a benchmark to compare actual progress and performance against the planned schedule.
Any changes to the schedule must be documented and justified against the baseline sche...
posted on 30 Jan 2024
I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.
Residence: New York, Qualification: Bachelor's degree in Civil Engineering, Hobbies: Reading, Experience: 5 years in planning and scheduling
Residence: New York
Qualification: Bachelor's degree in Civil Engineering
Hobbies: Reading
Experience: 5 years in planning and scheduling
M stands for 'Mix' in M20.
M20 is a designation for a concrete mix with a compressive strength of 20 megapascals (MPa).
The 'M' in M20 represents the word 'Mix', indicating that it is a mix of cement, sand, and aggregate.
The number following 'M' in M20 denotes the compressive strength of the concrete mix.
Different grades of concrete have different compressive strength requirements, and the 'M' designation helps in identi
Curing is necessary for concrete to ensure proper hydration and strength development.
Curing prevents moisture loss from the concrete, allowing it to maintain its desired water-cement ratio.
It helps in reducing shrinkage and cracking by providing a controlled environment for the concrete to cure.
Curing promotes the formation of calcium silicate hydrate (CSH) gel, which contributes to the strength and durability of concr...
Water is added to concrete after casting to maintain moisture content and achieve early strength and resist creep formation.
Adding water to concrete after casting helps to prevent excessive moisture loss.
Maintaining moisture content in concrete is important for proper hydration of cement particles.
Watering concrete can also help in reducing shrinkage and cracking.
By providing moisture, the concrete gains strength faste...
The steps involved in concreting include site preparation, formwork, reinforcement, mixing, pouring, leveling, finishing, and curing.
Site preparation involves clearing the area and ensuring proper drainage.
Formwork is constructed to shape and support the concrete.
Reinforcement is placed to provide strength to the concrete structure.
Concrete ingredients are mixed in the correct proportions.
The mixed concrete is poured i...
The allowable height for free fall for concrete depends on several factors.
The allowable height for free fall for concrete is typically specified by the project specifications or industry standards.
The height is influenced by factors such as the type of concrete mix, slump value, and the presence of reinforcing steel.
For example, for normal weight concrete with a slump of 3 to 4 inches and no reinforcing steel, the all...
Segregation is the separation of coarse and fine particles in concrete mix, while bleeding is the upward movement of water in fresh concrete.
Segregation occurs when the coarse aggregates settle down due to gravity, resulting in a non-uniform distribution of particles in the mix.
Bleeding happens when excess water in the concrete mix rises to the surface, leaving behind a layer of water on top.
Segregation can lead to a d...
Bleeding and segregation are common issues in concrete construction.
Bleeding occurs when excess water in the concrete mixture rises to the surface, leaving behind a layer of water.
Segregation happens when the coarse aggregates separate from the rest of the concrete mixture.
Both bleeding and segregation can negatively impact the strength and durability of the concrete.
Proper mix design, adequate compaction, and appropri...
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
posted on 8 Apr 2024
posted on 26 Nov 2022
I applied via Referral and was interviewed before Nov 2021. There was 1 interview round.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 10 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Production norms for a 36" diameter pipeline are determined based on factors such as material, pressure, and flow rate.
Production norms for a 36" diameter pipeline will vary depending on the material of the pipeline (e.g. steel, PVC), the pressure it needs to withstand, and the desired flow rate.
Factors such as the type of fluid being transported, environmental conditions, and regulatory requirements also play a role i...
Fabrication norms for spools up to 36" diameter involve specific welding procedures, material specifications, and quality control measures.
Welding procedures must adhere to ASME standards for pressure piping.
Material specifications should meet project requirements and industry standards.
Quality control measures include non-destructive testing (NDT) such as radiography and ultrasonic testing.
Spools may require post-weld...
I have extensive experience in supervising multidisciplinary construction activities, ensuring coordination and efficiency.
Experience in overseeing various construction activities such as civil, mechanical, electrical, and structural work
Ability to coordinate with different teams and stakeholders to ensure smooth progress of projects
Knowledge of construction regulations and standards to ensure compliance
Strong communic...
Associate Engineer
62
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Associate Manager
40
salaries
| ₹7 L/yr - ₹14 L/yr |
Project Engineer
33
salaries
| ₹4.5 L/yr - ₹10 L/yr |
QA QC Engineer
33
salaries
| ₹2.5 L/yr - ₹8.6 L/yr |
Quality Engineer
25
salaries
| ₹2 L/yr - ₹8.1 L/yr |
L&T Construction
Godrej Properties
Tata Projects
Shapoorji Pallonji Group