Upload Button Icon Add office photos

Filter interviews by

Kapil Group Jr Civil Site Engineer Interview Questions and Answers

Updated 29 Mar 2024

Kapil Group Jr Civil Site Engineer Interview Experiences

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Calculate the weight of steel bars.
  • Ans. 

    The weight of steel bars can be calculated by multiplying the volume of the steel bar by its density.

    • Calculate the volume of the steel bar by using the formula: Volume = (π * (Diameter)^2 * Length) / 4

    • Determine the density of the specific type of steel being used

    • Multiply the volume by the density to get the weight of the steel bar

  • Answered by AI
  • Q2. What is workability.
  • Ans. 

    Workability refers to the ease and ability of a material to be worked with and manipulated during construction.

    • Workability is important in construction as it affects the ease of placing, compacting, and finishing concrete or other materials.

    • Factors affecting workability include water content, aggregate size and shape, temperature, and admixtures.

    • For example, a concrete mix with high workability will flow easily into fo...

  • Answered by AI
  • Q3. What is bar bending schedule?
  • Ans. 

    Bar bending schedule is a document detailing the shape, quantity, length, and bending dimensions of steel bars used in construction.

    • It is prepared by civil engineers to ensure proper placement and bending of reinforcement bars in concrete structures.

    • Includes details such as bar mark, diameter, number of bars, length, shape codes, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction...

  • Answered by AI
  • Q4. What is the densityof steel bars.
  • Ans. 

    The density of steel bars is approximately 7850 kg/m^3.

    • The density of steel bars is typically around 7850 kg/m^3.

    • Density can vary slightly depending on the specific type of steel used.

    • Density is a measure of mass per unit volume.

  • Answered by AI
  • Q5. What is the mix ratio of grade M20?
  • Ans. 

    The mix ratio of grade M20 concrete is 1:1.5:3 (cement:sand:aggregate).

    • Grade M20 concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).

    • This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.

    • For example, for a 1 cubic meter of M20 concrete, 0.5 cubic meters of sand and 1.5 cubic meters of aggregate are used.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I want to learn skills and experience with site visit.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Q2. Do you use drawing and technology in your work?
  • Q3. Are you doing to maintain time in your life
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Q2. What methods do you use to verify information?

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What interests you about Civil Lines?
  • Ans. 

    I am fascinated by the impact Civil Lines have on urban development and infrastructure.

    • The opportunity to contribute to the design and construction of roads, bridges, and buildings

    • The challenge of ensuring safety and efficiency in infrastructure projects

    • The chance to work on projects that improve the quality of life for communities

    • The satisfaction of seeing tangible results of your work, such as a new bridge connecting

  • Answered by AI
  • Q2. What factors influenced your decision to choose our company?
  • Ans. 

    I was impressed by your company's reputation for innovative projects and commitment to sustainability.

    • Reputation for innovative projects

    • Commitment to sustainability

    • Positive reviews from current employees

    • Company's values align with my own

    • Opportunities for professional growth and development

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is the total experience
  • Q2. Your current CTC
Round 2 - Technical 

(2 Questions)

  • Q1. How much type of project
  • Q2. What was the memorable work
Round 3 - One-on-one 

(2 Questions)

  • Q1. Your Designation in this company
  • Q2. What is the look after
Round 4 - HR 

(2 Questions)

  • Q1. Your Notice period
  • Q2. Your expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - We have work on target base so that All work should be complete in time frame
And all Documents work should be complete according to work, otherwise your hard work is in vain.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(11 Questions)

  • Q1. Scar drawing and technical point
  • Q2. With safety trying best output
  • Q3. Field requirement and safety first
  • Q4. Working area material properly staged
  • Q5. Focus on work quality
  • Q6. Be carefull with machinery
  • Q7. Everytime touch with workers
  • Q8. Given detail of senior timely
  • Q9. Proper discussion with senior
  • Q10. Touch with total staff
  • Ans. 

    Maintain regular communication and interaction with all staff members.

    • Regularly check in with staff to ensure they have the resources and support they need

    • Hold regular team meetings to discuss project progress and address any concerns

    • Encourage open communication and feedback from all team members

    • Provide opportunities for team building and collaboration

    • Lead by example by being accessible and approachable to all staff me

  • Answered by AI
  • Q11. Given 110% daily

Kapil Group Interview FAQs

How many rounds are there in Kapil Group Jr Civil Site Engineer interview?
Kapil Group interview process usually has 1 rounds. The most common rounds in the Kapil Group interview process are Technical.

Tell us how to improve this page.

Kapil Group Jr Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Wipro Interview Questions
3.7
 • 5.6k Interviews
L&T Construction Interview Questions
4.0
 • 703 Interviews
Tata Projects Interview Questions
4.2
 • 406 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
View all

Kapil Group Jr Civil Site Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

5.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Accountant
7 salaries
unlock blur

₹2.1 L/yr - ₹4 L/yr

Executive Accountant
7 salaries
unlock blur

₹1.5 L/yr - ₹3 L/yr

Assistant Manager
6 salaries
unlock blur

₹2.5 L/yr - ₹3.5 L/yr

Business Executive
5 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

Senior Architect
5 salaries
unlock blur

₹7.2 L/yr - ₹12.5 L/yr

Explore more salaries
Compare Kapil Group with

Adani Group

3.9
Compare

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview