Q1. What is the difference between ABT and TBT? Why both are necessary?

Ans.

ABT is Anytime Breath Test and TBT is Tool Box Talk. ABT is used to detect alcohol consumption while TBT is used to discuss safety measures.

  • ABT is a test to detect alcohol consumption at any time while TBT is a safety meeting held before starting work.

  • ABT is necessary to ensure that employees are not under the influence of alcohol while working while TBT is necessary to discuss safety measures and prevent accidents.

  • ABT is usually conducted randomly while TBT is conducted regu...read more

View 2 more answers

Q2. How to handle the situation incase of any accident occurred?

Ans.

In case of an accident, the situation should be immediately assessed, emergency services should be contacted, and necessary first aid should be provided.

  • Assess the situation to determine the severity of the accident

  • Contact emergency services (ambulance, fire department, etc.)

  • Secure the area to prevent further accidents or injuries

  • Provide necessary first aid to the injured individuals

  • Document the accident and gather information for investigation purposes

View 3 more answers

Q3. How to prepare JOINT MEASUREMENT SHIT

Ans.

Joint measurement sheet is prepared to record the measurements of joints in civil construction projects.

  • Start by identifying the type of joint and its purpose.

  • Measure the dimensions of the joint, including length, width, and depth.

  • Record any additional details such as the type of joint material used.

  • Ensure accurate measurements by using appropriate tools like a tape measure or calipers.

  • Include sketches or diagrams to illustrate the joint's configuration if necessary.

View 5 more answers

Q4. The process of an accident and risk analysis?

Ans.

Accident and risk analysis involves identifying potential hazards, assessing the likelihood and severity of accidents, and implementing measures to mitigate risks.

  • Identify potential hazards in the workplace or environment

  • Assess the likelihood and severity of accidents that could occur

  • Evaluate the effectiveness of existing safety measures

  • Implement measures to mitigate risks and prevent accidents

  • Regularly review and update the risk assessment process

  • Examples: conducting a hazar...read more

View 1 answer
Discover GP Global interview dos and don'ts from real experiences

Q5. What is Engine

Ans.

An engine is a machine that converts energy into mechanical force or motion.

  • Engines are used in various applications such as automobiles, aircraft, and power plants.

  • They typically operate by burning fuel to generate heat, which is then converted into mechanical energy.

  • Different types of engines include internal combustion engines, steam engines, and electric motors.

  • Engines can be classified based on their fuel source, such as gasoline engines, diesel engines, or electric engi...read more

View 4 more answers

Q6. Idea about BBS ( bar bending schedule)

Ans.

BBS (Bar Bending Schedule) is a detailed report that provides information about the reinforcement steel required for a construction project.

  • BBS is prepared by civil engineers to ensure accurate fabrication and placement of reinforcement bars.

  • It includes details like bar mark, bar size, length, shape, and number of bars required for each structural element.

  • BBS helps in estimating the quantity of steel required, reducing wastage, and ensuring proper reinforcement.

  • It is essentia...read more

View 2 more answers
Are these interview questions helpful?

Q7. What is the 7 day strength of cube?

Add your answer

Q8. Junction tower point details

Ans.

Junction tower point details refer to the specifications and characteristics of the junction tower in a mechanical engineering context.

  • Junction tower points are used in mechanical engineering for supporting and connecting various components.

  • They are designed to withstand high loads and provide stability.

  • The details include dimensions, material composition, load-bearing capacity, and connection methods.

  • Examples of junction tower points include those used in power transmission ...read more

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is lap length

Ans.

Lap length is the amount of overlap between two reinforcing bars in a concrete structure.

  • It is necessary to ensure the strength and stability of the structure.

  • The lap length is determined by the diameter of the bars and the grade of the concrete.

  • It is specified in the design drawings and codes.

  • For example, in a beam, the lap length is typically 50 times the diameter of the bar.

Add your answer

Q10. 66 % of the target strength of concrete

Add your answer

Q11. Type of project executed

Ans.

Various types of projects executed including commercial buildings, infrastructure projects, and residential developments.

  • Commercial buildings

  • Infrastructure projects

  • Residential developments

Add your answer

Q12. cube tests for quality

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.2
 • 641 Interview Questions
4.4
 • 436 Interview Questions
3.8
 • 331 Interview Questions
4.2
 • 220 Interview Questions
4.1
 • 204 Interview Questions
3.6
 • 172 Interview Questions
View all
Top Kanwar Enterprises Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter