Filter interviews by
Applying plastic object paint on sheet metal objects can have both short-term and long-term effects.
In the short term, the paint can provide a protective layer against corrosion and damage.
In the long term, the paint may start to peel or chip, exposing the sheet metal to potential rust and deterioration.
The paint may also affect the thermal conductivity of the sheet metal, potentially impacting its heat dissipation cap...
Top trending discussions
I applied via Walk-in and was interviewed in Dec 2020. There was 1 interview round.
Glass line reactor mechanical seal fitting parameters are critical for ensuring proper functioning and preventing leaks.
The fitting parameters depend on the type of mechanical seal being used.
Factors such as seal face material, seal face loading, and seal face geometry must be considered.
Proper installation and alignment of the mechanical seal is also important.
Regular maintenance and monitoring of the seal is necessar...
I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.
Sales is the process of persuading a potential customer to purchase a product or service.
Sales involves identifying potential customers and their needs
Salespeople use various techniques to convince customers to buy
Sales requires building relationships with customers to encourage repeat business
Sales can involve both face-to-face interactions and online transactions
Examples of sales include selling cars, insurance, and
I applied via Company Website and was interviewed before Jan 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Written questions on technical mcq type
To run a pump, ensure power supply is connected, prime the pump, open necessary valves, and start the pump.
Check power supply is connected and turned on
Prime the pump by filling it with liquid before starting
Open necessary valves to allow flow
Start the pump according to manufacturer's instructions
posted on 6 Jul 2024
I applied via Walk-in and was interviewed before Jul 2023. There was 1 interview round.
posted on 22 Dec 2022
I applied via Company Website and was interviewed in Nov 2022. There were 2 interview rounds.
The company generates 500 MW of energy.
The company's energy generation capacity is 500 MW.
The company has a power plant that generates 500 MW of energy.
The energy output of the company is 500 MW.
The company's energy generation is sufficient to power a large city.
I don't have the available data.
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
The amount of space filled by dust varies depending on the quantity and size of particles.
The space filled by dust can range from a small area on a surface to an entire room or building.
Factors such as air circulation, particle size, and accumulation over time can affect the amount of space filled by dust.
For example, a dusty bookshelf may only fill a few square feet of space, while a neglected attic could be completel
Measurement refers to the process of determining the size, length, quantity, or extent of something using standard units.
Measurement involves comparing an unknown quantity to a known standard unit.
Examples of measurements include length (inches, meters), weight (pounds, kilograms), volume (liters, gallons), and time (seconds, minutes).
Accurate measurements are essential in fields such as science, engineering, and const
One liter of cement-based primer typically covers around 8 to 10 square meters of surface area.
One liter of cement-based primer covers approximately 8 to 10 square meters
Coverage may vary depending on the porosity and texture of the surface
It is recommended to refer to the manufacturer's instructions for specific coverage rates
Types of primers include bonding primers, stain-blocking primers, and high-build primers.
Bonding primers help paint adhere to surfaces like metal or plastic
Stain-blocking primers prevent stains from bleeding through paint
High-build primers are thick and fill in imperfections on surfaces
Other types include shellac-based primers, oil-based primers, and water-based primers
Oil paint can take anywhere from a few days to several weeks to fully dry, depending on factors like thickness and environmental conditions.
Oil paint can take anywhere from a few days to several weeks to dry completely.
Factors like the thickness of the paint layer and environmental conditions (humidity, temperature) can affect drying time.
Thicker layers of oil paint will take longer to dry compared to thin layers.
Paint...
based on 1 interview
Interview experience
Production Officer
253
salaries
| ₹3.1 L/yr - ₹7.2 L/yr |
Area Sales Manager
219
salaries
| ₹8.8 L/yr - ₹27 L/yr |
Senior Officer
200
salaries
| ₹4.6 L/yr - ₹11 L/yr |
Territory Sales Executive
194
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Officer
175
salaries
| ₹2.3 L/yr - ₹8 L/yr |
Berger Paints
Pidilite Industries
SRF
AkzoNobel