Filter interviews by
Production planning and control is the process of coordinating and managing all activities necessary to ensure efficient production of goods.
Production planning involves determining what to produce, when to produce, and how much to produce.
Production control involves monitoring and controlling the production process to ensure it stays on track.
It helps in optimizing resources, reducing costs, and meeting customer deman...
I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.
Top trending discussions
posted on 28 Jul 2022
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Feb 2024. There were 3 interview rounds.
Includes 60 questions more focus on technical questions
GD&T symbols are used in engineering drawings to specify the geometric characteristics of a part.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include perpendicularity, concentricity, flatness, etc.
Used to communicate design requirements accurately
Ensures parts are manufactured to the correct dimensions and tolerances
posted on 4 Apr 2024
I applied via campus placement at Sri Vasavi Engineering College, Tadepalligudem and was interviewed in Mar 2024. There were 2 interview rounds.
Suspension is a system of springs, shock absorbers, and linkages that connects a vehicle to its wheels and allows relative motion between the two.
Suspension system helps to absorb shocks and vibrations from the road surface, providing a smoother ride for passengers.
It also helps to maintain traction and control of the vehicle, especially during cornering and braking.
Examples of suspension systems include independent su...
About EV, and Engines for Mechanical Engineering Students
posted on 25 Feb 2024
posted on 14 May 2024
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 18 Oct 2023
I applied via Approached by Company and was interviewed in Sep 2023. There were 4 interview rounds.
I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.
Interview experience
based on 79 reviews
Rating in categories
Quality Executive
23
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Design Engineer
12
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Store Executive
11
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Packing Operator
8
salaries
| ₹2.2 L/yr - ₹2.6 L/yr |
Executive Production
7
salaries
| ₹3.5 L/yr - ₹6 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Resources