Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, building erection, finishing, and inspection.
Planning: Develop project scope, schedule, and budget.
Designing: Create detailed plans and blueprints.
Obtaining permits: Obtain necessary approvals from local authorities.
Site preparation: Clearing, grading, and leveling the construction site.
Foundation construc...
Different activities in project execution involve planning, scheduling, monitoring, controlling, and closing.
Planning involves defining project scope, objectives, and deliverables.
Scheduling includes creating timelines, assigning resources, and setting milestones.
Monitoring involves tracking progress, identifying issues, and making adjustments.
Controlling focuses on ensuring project stays on track and within budget.
Clo...
Top trending discussions
posted on 11 Feb 2025
I was interviewed in Aug 2024.
posted on 18 Jul 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
To ensure successful delivery from project conception to execution, I would focus on clear communication, detailed planning, proactive problem-solving, and regular monitoring.
Establish clear project goals and objectives
Create a detailed project plan with timelines and milestones
Regularly communicate with stakeholders to ensure alignment and address any issues
Proactively identify and address potential risks and challeng...
I have over 5 years of technical experience in project management, construction, and engineering design.
Managed multiple construction projects from initiation to completion
Proficient in AutoCAD and other design software
Experience in creating project schedules and budgets
Knowledge of construction materials and methods
Collaborated with cross-functional teams to ensure project success
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
posted on 10 Jun 2024
posted on 6 Apr 2024
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Nov 2022. There were 4 interview rounds.
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Deputy Manager
574
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Senior Engineer
554
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Assistant Manager
544
salaries
| ₹3.8 L/yr - ₹14.6 L/yr |
Civil Engineer
252
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power