To crash a program in Primavera P6 with resource loading and assigning, you can overload resources, assign more resources than available, or level resources improperly.
Overload resources by assigning more work to a resource than they can handle
Assign more resources to a task than are available in the resource pool
Level resources improperly by not considering resource availability and constraints
Project life cycle involves initiation, planning, execution, monitoring & controlling, and closure stages with management processes ensuring successful completion.
Initiation stage involves defining project scope, objectives, and feasibility.
Planning stage includes creating a detailed project plan, schedule, and budget.
Execution stage involves carrying out the project activities as per the plan.
Monitoring & controlling ...
Top trending discussions
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 3 interview rounds.
I have extensive experience using scheduling software to create and manage project timelines.
Proficient in using popular scheduling software such as Microsoft Project, Primavera P6, and Asana
Ability to create detailed project schedules, allocate resources, and track progress
Experience in setting dependencies, milestones, and critical paths to ensure project timelines are met
Familiarity with Gantt charts and other sched
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
posted on 30 Jun 2023
I applied via Referral and was interviewed in May 2023. There was 1 interview round.
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I was interviewed in Oct 2022.
posted on 27 May 2022
I applied via Referral and was interviewed in Apr 2022. There was 1 interview round.
posted on 19 Mar 2022
Interview experience
based on 1 review
Rating in categories
Deputy Manager
606
salaries
| ₹5.1 L/yr - ₹18 L/yr |
Assistant Manager
524
salaries
| ₹3.8 L/yr - ₹14.8 L/yr |
Senior Engineer
522
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Civil Engineer
247
salaries
| ₹2 L/yr - ₹7.7 L/yr |
Manager
242
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power