Filter interviews by
Be the first one to contribute and help others!
posted on 22 Jun 2023
Technical round with system knowledge check and HOD round
I was interviewed before Apr 2020.
posted on 4 Aug 2022
I was interviewed in Jan 2023.
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
To prepare the grns, ensure proper receiving procedures are followed. To maintain store activity, focus on inventory management, staff training, and customer service.
Implement a system for receiving and inspecting goods to ensure quality and accuracy
Regularly check inventory levels and reorder products as needed to prevent stockouts
Train staff on proper store procedures, customer service, and product knowledge
Monitor s...
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
It includes logical reasoning, grammer etc..
Delhi pollution has increased due to various factors.
Increase in vehicular traffic
Burning of crop residue in nearby states
Industrial emissions
Construction activities
Lack of proper waste management
Geographical location and weather conditions
Government policies and enforcement
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
To solve construction problems, quality, safety, progress, and time schedule, a project manager should prioritize communication, risk management, and continuous improvement.
Establish clear communication channels with all stakeholders
Identify potential risks and develop contingency plans
Regularly review and improve quality control processes
Ensure compliance with safety regulations and provide training to workers
Monitor
posted on 15 Dec 2021
I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.
posted on 28 Sep 2021
I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.
STP is a wastewater treatment plant that uses physical, chemical, and biological processes to remove pollutants from sewage.
STP receives sewage from households and industries through a network of underground pipes.
The sewage is screened to remove large objects and then sent to a grit chamber to remove sand and grit.
The sewage is then sent to a primary clarifier where solids settle to the bottom and are removed as sludg...
Transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction.
They consist of two or more coils of wire called windings.
The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.
When an alternating current flows through the primary...
DG sets safety and operation are crucial for uninterrupted power supply.
DG sets should be installed in a well-ventilated area to avoid carbon monoxide poisoning.
Regular maintenance and testing of DG sets are necessary to ensure their safe operation.
Proper grounding and earthing of DG sets are essential to prevent electrical hazards.
Emergency stop buttons and alarms should be installed to shut down the DG sets in case o...
based on 10 reviews
Rating in categories
Team Lead
4
salaries
| ₹0.1 L/yr - ₹10.5 L/yr |
JLL
CBRE
NoBroker
Lodha Group