Upload Button Icon Add office photos

Filter interviews by

JSW Bhushan Power & Steel Interview Questions, Process, and Tips for Experienced

Updated 5 Mar 2025

Top JSW Bhushan Power & Steel Interview Questions and Answers for Experienced

View all 30 questions

JSW Bhushan Power & Steel Interview Experiences for Experienced

Popular Designations

34 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Boiler interlock.
Round 2 - One-on-one 

(1 Question)

  • Q1. Boiler tripping parameters.
  • Ans. 

    Boiler tripping parameters are specific conditions that cause a boiler to shut down automatically for safety reasons.

    • Boiler pressure exceeding safe limits

    • Low water level in the boiler

    • Flame failure or loss of ignition

    • High furnace temperature

    • Excessive steam temperature or pressure

  • Answered by AI

Power Plant Engineer Interview Questions asked at other Companies

Q1. Boiler cold start-up and shutdown process & types of emergencies in your experience, specific energy consumption, efficiency of boiler, coal size, GCV, What is 5S? How it is implemented in your company explain
View answer (1)

Senior Foreman Interview Questions & Answers

user image Munna Singh

posted on 12 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. Induction furnace eot crane
  • Ans. Induction furnace maintenance stand by crusible all general chaking
  • Answered by Munna Singh
  • Q2. Eot crane preventive maintenance shutdown work and all general chaking
  • Ans. Eot crane preventive maintenance Chaking oil level in thruster Chaking of wire rope condition Oil level in gear box Break setting chaking of wire rope lubrication Chaking gear coupling nut 🔩 bolt lt & ct main host rail & structure chaking proper house keeping wanted meterial all beating greasing Shutdown work planing Main host wire rope change .and rail and structure work
  • Answered Anonymously
  • Q3. Cooling tower maintenance and preventive maintenance shutdown work
  • Q4. Furnace coil cooling water pump preventive maintenance shutdown work
  • Ans. Chaking of unwanted noise and vibration Chaking bearing condition Chaking of shaft alignment and clearance Suction and discharge pressure Bearing lubrication level Corrosion and Dirt chaking
  • Answered by Munna Singh
  • Q5. Hydraulic power pack system maintenance
  • Q6. All main power work distribution
  • Ans. 

    Main power work distribution involves managing the distribution of electrical power throughout a construction site.

    • Coordinate with electricians to ensure proper installation and maintenance of power distribution systems

    • Monitor power usage and troubleshoot any issues that arise

    • Ensure compliance with safety regulations and protocols

    • Plan for future power needs and upgrades

    • Examples: overseeing the installation of temporary...

  • Answered by AI

Senior Foreman Interview Questions asked at other Companies

Q1. What is the mathed lap lenth of rebar
View answer (1)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. All control wireing and power wireing all dcs plc work going on
  • Q2. Automation rooling mill division jamshedpur
Round 2 - One-on-one 

(2 Questions)

  • Q1. I am electrical engineer working on it and found in the same as par required production okay for me to get the same as the motor is overloaded due to the machine running ok but
  • Q2. Automation work
Round 3 - Case Study 

I am electrical engineer working on it jamshedpur jharkhand steel strips wheel limited jamshedpur jharkhand

Diploma Electrical Engineer Interview Questions asked at other Companies

Q1. What is the use of star delta connection in electrical ?
View answer (3)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Steel sector .
  • Q2. Rolling process

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)

JSW Bhushan Power & Steel interview questions for popular designations

 Senior Engineer

 (4)

 Deputy General Manager Operations

 (4)

 Management Trainee

 (3)

 Engineer

 (3)

 Assistant Engineer

 (2)

 Electrical Engineer

 (2)

 Store Keeper

 (2)

 Site Supervisor

 (2)

Interview Questions & Answers

user image Anonymous

posted on 19 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. About behaviour
  • Q2. About plant technical
  • Q3. Normal question behaviour with colique.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be always cool mind during interview

Get interview-ready with Top JSW Bhushan Power & Steel Interview Questions

Senior Engineer Interview Questions & Answers

user image mohit dutta

posted on 14 Aug 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Instrument ,PLC qus ,networking

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)

Interview Questions & Answers

user image Anonymous

posted on 13 Apr 2024

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

I have mostly exprence about project job Strtural feb/erection and various types of service piping fitup and placement or commissioning work done. Raw materials handling system operation maintainc work done

Round 2 - One-on-one 

(1 Question)

  • Q1. Projects question/opration/maintanc of RMHS conveyrior systems

Interview Preparation Tips

Topics to prepare for JSW Bhushan Power & Steel interview:
  • Operations
  • Conveyrior

DGM Operations Interview Questions & Answers

user image Ramakant Sahu

posted on 21 Feb 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Ask about regular job assignment.
  • Q2. Erection, Commissioning and Testing of Steel Plants

Interview Preparation Tips

Topics to prepare for JSW Bhushan Power & Steel DGM Operations interview:
  • Project Management

DGM Operations Interview Questions asked at other Companies

Q1. How do you plan to do the mold manufacturing process.
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Details asking of my self background & work station process to be clear.
  • Q2. From managment given details for company & working process details given to me.
  • Q3. And last interview attentent with company's director sir, & final.

Interview Preparation Tips

Interview preparation tips for other job seekers - To be honest, sincerely working, hardworking & proud to be disspleane manner to behave.

Field Officer Interview Questions asked at other Companies

Q1. What is a tractor, from where the word tractor originated, What is horsepower, what models come in sonalika, what is PTO, drawbar, hitch, implements used with tractor
View answer (3)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to RMPP (Raw Material Preparation Plants

Interview Preparation Tips

Interview preparation tips for other job seekers - Be perfect and bold

Deputy General Manager Operations Interview Questions asked at other Companies

Q1. What are the Labour Laws that you are familiar with?
View answer (1)

JSW Bhushan Power & Steel Interview FAQs

How many rounds are there in JSW Bhushan Power & Steel interview for experienced candidates?
JSW Bhushan Power & Steel interview process for experienced candidates usually has 1-2 rounds. The most common rounds in the JSW Bhushan Power & Steel interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for JSW Bhushan Power & Steel interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JSW Bhushan Power & Steel. The most common topics and skills that interviewers at JSW Bhushan Power & Steel expect are Learning.
What are the top questions asked in JSW Bhushan Power & Steel interview for experienced candidates?

Some of the top questions asked at the JSW Bhushan Power & Steel interview for experienced candidates -

  1. What is impedance voltage of transform...read more
  2. TRANSACTION CODE OF SAP FICO-LIKE T -CODE FOR B/S-F.01,VENDOR LEDGER-FBL1N,PURC...read more
  3. Draw the SLD of your plan...read more
How long is the JSW Bhushan Power & Steel interview process?

The duration of JSW Bhushan Power & Steel interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

JSW Bhushan Power & Steel Interview Process for Experienced

based on 19 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.0
 • 876 Interviews
UltraTech Cement Interview Questions
4.2
 • 602 Interviews
S&P Global Interview Questions
4.1
 • 283 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Cummins Interview Questions
4.3
 • 234 Interviews
Jindal Stainless Interview Questions
4.2
 • 217 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

JSW Bhushan Power & Steel Reviews and Ratings

based on 1.4k reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.5

Salary

3.7

Job security

3.7

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 1.4k Reviews and Ratings
Engineer
422 salaries
unlock blur

₹2.6 L/yr - ₹7.5 L/yr

Senior Engineer
395 salaries
unlock blur

₹3 L/yr - ₹9.3 L/yr

Assistant Manager
319 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Assistant Engineer
286 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Mechanical Engineer
133 salaries
unlock blur

₹2.5 L/yr - ₹7.6 L/yr

Explore more salaries
Compare JSW Bhushan Power & Steel with

Larsen & Toubro Limited

3.9
Compare

UltraTech Cement

4.2
Compare

Tata Steel

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview