Filter interviews by
I was interviewed in Jan 2025.
Work experience in which field
I am looking for a competitive salary based on my experience and qualifications.
I am open to discussing salary based on the responsibilities and expectations of the role.
I have researched industry standards for Site Supervisor salaries in this region.
I am looking for a salary that reflects my skills and contributions to the team.
I am flexible and willing to negotiate based on the overall compensation package offered.
My nearest joining date possibility is within two weeks.
I am available to start within two weeks of receiving an offer.
I can provide specific dates once an offer is extended.
I am flexible and willing to adjust my start date if needed.
Boiler tripping parameters are specific conditions that cause a boiler to shut down automatically for safety reasons.
Boiler pressure exceeding safe limits
Low water level in the boiler
Flame failure or loss of ignition
High furnace temperature
Excessive steam temperature or pressure
Main power work distribution involves managing the distribution of electrical power throughout a construction site.
Coordinate with electricians to ensure proper installation and maintenance of power distribution systems
Monitor power usage and troubleshoot any issues that arise
Ensure compliance with safety regulations and protocols
Plan for future power needs and upgrades
Examples: overseeing the installation of temporary...
I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.
I am electrical engineer working on it jamshedpur jharkhand steel strips wheel limited jamshedpur jharkhand
JSW Bhushan Power & Steel interview questions for popular designations
Designed and implemented a smart irrigation system using IoT technology for efficient water usage.
Researched IoT technology and its applications in agriculture
Developed a system to monitor soil moisture levels and weather conditions
Implemented automated watering based on real-time data
Conducted field tests to validate system performance
Transformer efficiency is the ratio of output power to input power, indicating how well the transformer converts electrical energy.
Efficiency is calculated as output power divided by input power, multiplied by 100%.
Efficiency is affected by factors such as core losses, copper losses, and load conditions.
For example, a transformer with an efficiency of 95% converts 95% of the input power into output power.
Efficiency can...
Get interview-ready with Top JSW Bhushan Power & Steel Interview Questions
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I have mostly exprence about project job Strtural feb/erection and various types of service piping fitup and placement or commissioning work done. Raw materials handling system operation maintainc work done
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
Top trending discussions
The duration of JSW Bhushan Power & Steel interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 70 interviews
Interview experience
based on 1.4k reviews
Rating in categories
Engineer
426
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
397
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
303
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
288
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
Steel Authority Of India
ArcelorMittal Nippon Steel
Jindal Steel and Power