Filter interviews by
Top trending discussions
posted on 6 Sep 2023
Prices of procurement refer to the costs associated with acquiring goods or services for a business.
Prices of procurement can vary based on factors such as quantity, quality, and supplier negotiations.
It is important for a purchase manager to analyze prices of procurement to ensure cost-effectiveness.
Examples of prices of procurement include raw materials, transportation costs, and supplier fees.
3 comparison to be used for vendor costing and they sent out best of them
posted on 21 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 5 interview rounds.
Normal question general knowledge
I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.
Costing of sheet metal involves calculating the expenses incurred in the production of sheet metal products.
Costing includes material cost, labor cost, and overhead expenses.
Material cost includes the cost of raw materials used in the production of sheet metal.
Labor cost includes the wages paid to workers involved in the production process.
Overhead expenses include the cost of utilities, rent, and other indirect expens...
Costing of plastic material depends on various factors such as raw material cost, production process, transportation, and packaging.
Raw material cost is a major factor in determining the overall cost of plastic material.
Production process also plays a crucial role in costing as it affects the efficiency and quality of the product.
Transportation costs depend on the distance between the supplier and the manufacturer.
Pack...
SMT is a process of mounting electronic components onto a printed circuit board (PCB) using surface mount technology.
SMT involves placing components on the PCB surface and soldering them in place
This process is faster and more efficient than traditional through-hole technology
SMT components are smaller and lighter, allowing for more compact and portable devices
Examples of SMT components include resistors, capacitors, a
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
posted on 8 Dec 2020
Quality Engineer
14
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Senior Engineer
10
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Deputy Manager
6
salaries
| ₹5.1 L/yr - ₹8.4 L/yr |
Store Executive
6
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Junior Engineer
6
salaries
| ₹2.2 L/yr - ₹2.7 L/yr |
ABC CORPORATION
Havells
BHEL
GAO Tek