I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
posted on 2 Dec 2022
I applied via Job Portal and was interviewed before Dec 2021. There were 2 interview rounds.
Section 80C and Section 234F are two important sections under Income Tax Act.
Section 80C allows taxpayers to claim deductions up to Rs. 1.5 lakh on investments made in specified instruments such as PPF, ELSS, NSC, etc.
Section 234F deals with the late filing of income tax returns and imposes a penalty ranging from Rs. 1,000 to Rs. 10,000 depending on the delay.
I have extensive experience in various aspects of Direct Taxation.
I have worked on tax planning and compliance for individuals and corporations.
I have experience in filing tax returns, handling tax audits, and resolving tax disputes.
I am familiar with tax laws and regulations, and keep up-to-date with changes in tax codes.
I have also provided tax advice to clients on matters such as mergers and acquisitions, internatio...
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
posted on 2 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Discussed about experience, discussed about technical and professional skills
Good attitude and best interview procedure
posted on 6 Nov 2023
I appeared for an interview in May 2023.
posted on 24 Nov 2021
The permissible wastage of steel and cement varies depending on the project and the contractor's agreement.
Permissible wastage of steel and cement is usually specified in the contract agreement between the contractor and the client.
The percentage of permissible wastage can vary depending on the project and the type of steel and cement being used.
In general, the permissible wastage of steel is around 3-5%, while for cem...
Reconciliation is prepared by comparing two sets of records to ensure they are in agreement.
Identify the two sets of records to be compared
Ensure that the records are complete and accurate
Match the records based on common identifiers
Identify and investigate any discrepancies
Make necessary adjustments to bring the records into agreement
Document the reconciliation process and results
Project Manager
4
salaries
| ₹6.5 L/yr - ₹8.5 L/yr |
Civil Engineer
4
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures