Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Executing: Implement the project plan and manage resources effectively.
Monitoring: Track project progress, identify risks, and make necessary adjustments.
Closing: Finalize...
Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.
Identify potential risks by conducting a thorough risk assessment
Assess the likelihood and impact of each risk on the project
Prioritize risks based on their severity and potential impact
Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...
Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.
Create a detailed schedule outlining the delivery dates of long lead items
Regularly monitor the progress of long lead items to ensure they are on track
Communicate effectively with suppliers to address any delays or issues
Utilize project management software to track and manage long lead items
I applied via Indeed and was interviewed in Oct 2023. There was 1 interview round.
Yes, standard codes are used for concrete mix design to ensure quality and safety.
Standard codes provide guidelines for selecting materials, proportions, and testing procedures for concrete mix design.
Examples of standard codes include ACI 318 for structural concrete and ASTM C94 for ready-mixed concrete.
Following standard codes helps ensure the durability, strength, and workability of the concrete mix.
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 1 Dec 2020
posted on 9 Aug 2023
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Interview experience
Assistant Manager
51
salaries
| ₹4 L/yr - ₹10 L/yr |
Sales Executive
36
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Senior Executive
22
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Deputy Manager
19
salaries
| ₹7.2 L/yr - ₹10 L/yr |
Site Engineer
19
salaries
| ₹4.5 L/yr - ₹8 L/yr |
Godrej Properties
Prestige Group
Sobha
DLF