i
JP Infra
Filter interviews by
posted on 24 Jun 2021
Top trending discussions
posted on 20 Dec 2020
A bridge is a structure that is built to span physical obstacles such as rivers, valleys, or roads.
Bridges are designed to support the weight of vehicles, pedestrians, or trains.
They are typically made of materials such as concrete, steel, or wood.
Bridges can be classified into different types based on their design, such as beam bridges, arch bridges, suspension bridges, or cable-stayed bridges.
They play a crucial role...
The least count of staff refers to the minimum number of staff required to efficiently manage and supervise a construction site.
The least count of staff is determined based on the size and complexity of the construction project.
It is important to have enough staff to ensure proper coordination, safety, and productivity on the site.
Factors to consider when determining the least count of staff include the scope of work, ...
JCB stands for Joseph Cyril Bamford, a British multinational corporation that manufactures construction equipment.
JCB is a well-known brand in the construction industry.
It is a British company that specializes in manufacturing construction equipment.
JCB produces a wide range of machinery, including excavators, backhoe loaders, and telescopic handlers.
The company was founded in 1945 by Joseph Cyril Bamford.
JCB equipment...
I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.
I applied via Referral and was interviewed in May 2023. There were 4 interview rounds.
Managed technical operations for a team of engineers, overseeing project timelines and deliverables.
Led a team of engineers in executing technical projects
Monitored project timelines and ensured deliverables were met
Collaborated with cross-functional teams to address technical challenges
Implemented process improvements to enhance efficiency
I was interviewed before Feb 2024.
Solder pilling is a defect in solder joints where small balls of solder form on the surface due to incomplete wetting.
Solder pilling occurs when there is insufficient flux to remove oxides from the surface of the joint.
It can also be caused by inadequate soldering temperature or time, leading to incomplete wetting of the joint.
Solder pilling can weaken the joint and lead to reliability issues in electronic components.
P...
D-wall is a term used in construction industry to refer to a type of retaining wall made of concrete or other materials.
D-wall stands for diaphragm wall, which is a reinforced concrete wall constructed in the ground using a narrow trench excavation method.
It is commonly used in deep excavation projects to provide support and prevent soil movement.
D-wall construction involves excavating a trench, installing reinforcemen...
GFRP stands for Glass Fiber Reinforced Polymer, used in construction for its high strength and corrosion resistance.
GFRP is a composite material made of glass fibers embedded in a polymer matrix.
It is commonly used in construction for reinforcing concrete structures, such as bridges, buildings, and tunnels.
GFRP offers high strength-to-weight ratio, corrosion resistance, and durability.
Examples of GFRP applications incl
S-Curve is a graphical representation of the growth of a project or product over time, showing slow initial progress, rapid growth, and eventual leveling off.
S-Curve is commonly used in project management to track the progress of a project.
It shows the relationship between time and cumulative costs or work completed.
The curve starts slowly as the project begins, then accelerates as work is being done efficiently, and f...
Critical activity is a task or process that is essential for the success of a project or operation.
Critical activities have a direct impact on the overall timeline and success of a project.
They often have dependencies on other tasks and must be completed on time to avoid delays.
Examples include testing phase in software development, finalizing budget in project management, and surgery in healthcare.
Identifying critical...
I have always admired the company's commitment to innovation and growth.
I have been following the company's progress and success for a while.
I believe in the company's values and vision.
I am excited about the opportunity to contribute to the company's future development.
My strengths include strong leadership skills, excellent communication abilities, and a proven track record of achieving results.
Strong leadership skills
Excellent communication abilities
Proven track record of achieving results
I applied via Approached by Company and was interviewed in Dec 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
Assistant Manager
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Godrej Properties
Prestige Group
Sobha
DLF