Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JP Infra Team. If you also belong to the team, you can get access from here

JP Infra Verified Tick

Compare button icon Compare button icon Compare
3.7

based on 205 Reviews

Filter interviews by

JP Infra AGM - Projects Interview Questions and Answers

Updated 7 Oct 2023

JP Infra AGM - Projects Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Related to the current position
  • Q2. RCC consultant coordination
  • Q3. Finishing the project
  • Q4. Site handling to complete the process
Round 3 - HR 

(1 Question)

  • Q1. Personal information and living location

Interview Preparation Tips

Interview preparation tips for other job seekers - Great place to work

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Casting related
Round 2 - Technical 

(2 Questions)

  • Q1. Soil Test related
  • Q2. Shear force Bending moment
Round 3 - HR 

(2 Questions)

  • Q1. Statutory documentary
  • Q2. Previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Is standard code for concrete mix design
  • Ans. 

    Yes, standard codes are used for concrete mix design to ensure quality and safety.

    • Standard codes provide guidelines for selecting materials, proportions, and testing procedures for concrete mix design.

    • Examples of standard codes include ACI 318 for structural concrete and ASTM C94 for ready-mixed concrete.

    • Following standard codes helps ensure the durability, strength, and workability of the concrete mix.

  • Answered by AI
  • Q2. Site test for steel

Interview Preparation Tips

Topics to prepare for Lodha Group Project Engineer - Civil interview:
  • Concrete technoloy
Interview preparation tips for other job seekers - Study basic concrete technology
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Salary expectation they asked
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions they asked

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep good preparation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal Interview Current CTC Current location Expected CTC
Round 2 - One-on-one 

(1 Question)

  • Q1. Projects Details Area of projects Types of projects
  • Ans. 

    The area of projects and types of projects I have worked on vary greatly.

    • I have worked on projects in various industries including construction, healthcare, and technology.

    • Types of projects I have worked on include software development, building construction, and medical equipment installation.

    • I am adaptable and able to quickly learn about new industries and project types.

    • I have experience working on both small and lar

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join on third party payroll, join only on company payroll.

Interview Questionnaire 

1 Question

  • Q1. Management skill, Execution field.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep confidence in interview.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Project experience
  • Q3. Project management

Interview Preparation Tips

Interview preparation tips for other job seekers - They have ask simple question 1)tell me about your self
2) Work experience,
3) project mangement

JP Infra Interview FAQs

How many rounds are there in JP Infra AGM - Projects interview?
JP Infra interview process usually has 3 rounds. The most common rounds in the JP Infra interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in JP Infra AGM - Projects interview?

Some of the top questions asked at the JP Infra AGM - Projects interview -

  1. Site handling to complete the proc...read more
  2. RCC consultant coordinat...read more
  3. Finishing the proj...read more

Tell us how to improve this page.

JP Infra AGM - Projects Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 343 Interviews
CBRE Interview Questions
4.2
 • 255 Interviews
NoBroker Interview Questions
3.2
 • 226 Interviews
Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 74 Interviews
View all
JP Infra AGM - Projects Salary
based on 4 salaries
₹15 L/yr - ₹18 L/yr
31% less than the average AGM - Projects Salary in India
View more details
Assistant Manager
52 salaries
unlock blur

₹4 L/yr - ₹10 L/yr

Sales Executive
36 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Senior Executive
22 salaries
unlock blur

₹2.7 L/yr - ₹6.6 L/yr

Deputy Manager
19 salaries
unlock blur

₹7.2 L/yr - ₹10 L/yr

Site Engineer
19 salaries
unlock blur

₹4.5 L/yr - ₹8 L/yr

Explore more salaries
Compare JP Infra with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare

DLF

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview