Upload Button Icon Add office photos

Filter interviews by

John Erectors Interview Questions and Answers

Updated 11 Sep 2024

John Erectors Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Interview about erection 

(2 Questions)

  • Q1. What is the density of mild steel
  • Ans. 

    The density of mild steel is approximately 7.85 g/cm^3.

    • The density of mild steel is around 7.85 grams per cubic centimeter.

    • Density can vary slightly depending on the exact composition of the steel.

    • Density is a physical property that relates the mass of a substance to its volume.

  • Answered by AI
  • Q2. What is the Young's modulus
  • Ans. 

    Young's modulus is a measure of the stiffness of a material.

    • Young's modulus is a material property that describes its stiffness or ability to deform under stress.

    • It is defined as the ratio of stress to strain in a material.

    • Higher Young's modulus indicates a stiffer material, while lower values indicate more flexibility.

    • It is measured in units of pressure, such as Pascals or pounds per square inch.

    • For example, steel has...

  • Answered by AI

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)

Jobs at John Erectors

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Some building material questions

Round 3 - HR 

(1 Question)

  • Q1. Tell me about you

Interview Preparation Tips

Interview preparation tips for other job seekers - hire
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basic aptitude questions

Round 2 - Coding Test 

Coding questions hard level like matrix etc

Interview Preparation Tips

Interview preparation tips for other job seekers - do study hard

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company

John Erectors Interview FAQs

How to prepare for John Erectors interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at John Erectors. The most common topics and skills that interviewers at John Erectors expect are Site Execution, Site Planning, Site Supervision, Fabrication and Safety Inspection.
What are the top questions asked in John Erectors interview?

Some of the top questions asked at the John Erectors interview -

  1. What is the density of mild st...read more
  2. What is the Young's modu...read more

Tell us how to improve this page.

John Erectors Interview Process

based on 3 interviews

Interview experience

3
  
Average
View more

John Erectors Reviews and Ratings

based on 19 reviews

2.8/5

Rating in categories

3.2

Skill development

3.1

Work-life balance

3.0

Salary

2.6

Job security

2.8

Company culture

2.8

Promotions

3.0

Work satisfaction

Explore 19 Reviews and Ratings
Site Engineer

Ballari,

Mumbai

+1

5-10 Yrs

₹ 6-7.5 LPA

Site Incharge

Ballari,

Mumbai

+1

8-13 Yrs

₹ 10-12 LPA

Safety Engineer

Ballari,

Mumbai

+1

4-8 Yrs

₹ 6-7.5 LPA

Explore more jobs
Accountant
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HR Assistant
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare John Erectors with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview