I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Tension and position control for accumulators in a flat metal processing line is crucial for maintaining smooth operations and quality output.
Accumulators are used to store and release tension in the metal strip to prevent wrinkles and ensure consistent feeding into the processing line.
Tension control systems monitor and adjust the amount of tension in the strip to prevent stretching or buckling during processing.
Posit...
Diameter and tension for a winder and rewinder are crucial for ensuring proper winding of materials.
Diameter is measured using sensors or manual gauges to ensure consistent winding.
Tension is controlled using tension control systems to prevent overstretching or slackness in the material.
Proper calibration of diameter and tension settings is essential for high-quality winding and rewinding.
Examples of tension control sy...
Top trending discussions
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I have 5 years of experience in management roles.
5 years of experience in management roles
Experience includes leading teams, setting goals, and achieving targets
Previous roles include Assistant Manager at Company X and Team Leader at Company Y
The notice period, current total compensation, and date of availability to join are important factors to consider when discussing a new job opportunity.
Notice period refers to the amount of time required to be given to the current employer before leaving the job.
CTC (Cost to Company) is the total compensation package offered by the employer, including salary, benefits, and bonuses.
Date of joining is the availability da...
posted on 31 May 2022
I applied via Company Website and was interviewed before May 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant
COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.
COS includes costs such as raw materials, labor, and manufacturing overhead.
Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.
Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...
EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.
EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.
It is represented by the ASCII control character with the code 04.
EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...
A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.
A claim is typically submitted by a policyholder or healthcare provider to an insurance company.
It includes details such as the services provided, dates of service, and the amount billed.
The insurance company reviews the claim to determine if it meets the policy's coverage criteria.
Once approved, the ...
RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.
RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.
It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.
RFIs are often used as a preliminary step before issui...
Estimates are calculated predictions of the cost, time, and resources required for a project.
Gather all relevant information and data related to the project
Break down the project into smaller tasks or components
Use historical data or industry benchmarks to estimate the time and cost for each task
Consider any potential risks or uncertainties that may impact the estimates
Document the estimates and communicate them clearl
posted on 17 Jul 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
based on 8 reviews
Rating in categories
Deputy Manager
47
salaries
| ₹5.2 L/yr - ₹12.5 L/yr |
Manager
39
salaries
| ₹7.8 L/yr - ₹18.2 L/yr |
Assistant Manager
39
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Asst. Chief Manager
26
salaries
| ₹10.2 L/yr - ₹24 L/yr |
Assistant Manager Design
17
salaries
| ₹3.1 L/yr - ₹5.7 L/yr |
Larsen & Toubro Limited
Tata Group
BHEL
Thermax Limited