i
JLL
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
Some general questions
Initiating substructure to finishing work involves proper planning, coordination, and communication.
Develop a detailed project plan outlining the sequence of activities from substructure to finishing work
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities
Regularly mo...
I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.
Prioritize tasks based on deadlines and importance
Set specific goals for each activity to stay focused
Create a schedule or to-do list to track progress
Delegate tasks to team members when needed to improve efficiency
Stay organized by keeping track of documents, emails, and meetings
My previous company was a construction firm specializing in commercial building projects.
Managed project timelines and budgets
Coordinated with architects, engineers, and subcontractors
Ensured compliance with building codes and regulations
Implemented quality control measures
Completed projects on time and within budget
Waterproofing is the process of making a structure or object resistant to water penetration.
Waterproofing can be done using various materials such as membranes, coatings, and sealants.
Proper surface preparation is essential before applying waterproofing materials.
Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.
Examples of waterproofing methods include using waterproof memb...
BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors
Develop safety procedures and protocols based on the identified hazards
Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors
Im...
I applied via Approached by Company and was interviewed in Jan 2024. There were 5 interview rounds.
Online based test on basic aptitude and problem solving tests.
posted on 23 Oct 2024
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Project flow chart outlines the steps from project initiation to completion and handover.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Execution: Implement the project plan, monitor progress, and manage any issues.
Monitoring and Controlling: Track project performance, make adjustments as needed.
Closing: Finalize all pr...
I rate my knowledge on MEP as advanced.
I have extensive experience managing MEP projects in various industries.
I am familiar with MEP systems and their integration within construction projects.
I have successfully coordinated with MEP subcontractors to ensure project success.
Updating the system involves implementing the latest software updates and patches.
Check for available software updates and patches
Schedule a time for system update to minimize disruption
Backup important data before updating
Test the updated system to ensure functionality
Communicate with stakeholders about the update process
I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.
OSHR design specification includes hardware and software requirements for the system.
Hardware requirements such as processor, memory, storage, and input/output devices.
Software requirements such as operating system, programming languages, and development tools.
Functional requirements such as user interface, data storage, and security features.
Non-functional requirements such as performance, reliability, and scalability...
The full form of FHTC is not clear. HDPE pipes have high strength and flexibility, while DI pipes are more durable. Wall thickness of water retaining structure depends on the design and load requirements.
FHTC full form is not clear
HDPE pipes have high strength and flexibility, making them suitable for underground installations and areas with high seismic activity
DI pipes are more durable and have a longer lifespan, mak...
The minimum required Sbc for raft foundation design of OHSR depends on various factors.
The size and weight of the OHSR
The soil type and bearing capacity
The depth of the foundation
The seismic zone of the location
Consulting a geotechnical engineer is recommended
The code of practice used for water retaining structures is BS EN 1992-3:2006.
BS EN 1992-3:2006 is the European standard for the design of concrete structures.
It provides guidelines for the design, construction, and maintenance of water retaining structures.
The code covers various types of water retaining structures such as reservoirs, tanks, and swimming pools.
It includes requirements for materials, structural design,...
posted on 19 Nov 2019
I applied via Naukri.com and was interviewed in May 2019. There were 4 interview rounds.
Mivan shuttering is a construction technique using aluminum formwork for casting concrete walls, slabs, columns, etc.
Mivan shuttering involves setting up aluminum formwork panels on site
The formwork is assembled and fixed using pins, wedges, and wallers
Concrete is poured into the formwork and allowed to set
Once the concrete has cured, the formwork is removed and reused for the next casting
Mivan shuttering is known for
based on 13 reviews
Rating in categories
Facility Executive
1k
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Assistant Manager
947
salaries
| ₹3.5 L/yr - ₹14 L/yr |
Assistant Project Leader
541
salaries
| ₹3.3 L/yr - ₹11.5 L/yr |
Senior Analyst
507
salaries
| ₹3 L/yr - ₹9.9 L/yr |
Assistant Facility Manager
486
salaries
| ₹3 L/yr - ₹10.3 L/yr |
CBRE
Colliers India
Cushman & Wakefield
Knight Frank