i
JLL
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2020. There were 5 interview rounds.
The size of wire required for j500 tone chiller depends on the voltage and amperage of the chiller.
The wire size should be determined based on the voltage and amperage of the chiller.
The National Electrical Code (NEC) provides guidelines for selecting the appropriate wire size.
The wire size should be able to handle the maximum current that the chiller will draw.
A larger wire size may be required for longer wire runs or...
JLL interview questions for designations
Top trending discussions
Magnetic balancing of a transformer involves adjusting the magnetic flux to ensure proper operation and efficiency.
Magnetic balancing is necessary to prevent overheating and ensure optimal performance of the transformer.
This process involves adjusting the turns ratio of the transformer windings to achieve the desired magnetic flux.
Proper magnetic balancing helps in reducing losses and improving the efficiency of the tr...
Testing of circuit breakers involves checking for proper functionality and safety measures.
Performing visual inspections for any signs of damage or wear
Testing the circuit breaker with a multimeter to ensure proper voltage and current readings
Tripping the circuit breaker manually to test its response time
Checking for proper grounding and connections
Conducting insulation resistance tests to ensure safety
Regular maintena
Transformers are rated in kVA because it represents the apparent power capacity of the transformer.
kVA is a unit of apparent power, which takes into account both the real power (kW) and reactive power (kVAR) of the transformer.
The kVA rating helps in determining the maximum load that a transformer can handle without overheating or overloading.
It is important to specify the kVA rating of a transformer to ensure compatib...
I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
The compliances followed for the complex include building codes, safety regulations, and environmental standards.
Building codes ensure that the complex meets structural and safety requirements.
Safety regulations cover fire safety, emergency preparedness, and security measures.
Environmental standards focus on waste management, energy efficiency, and sustainability.
Compliances may also include local zoning laws and regul...
I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.
The amount of fresh air added in the AHU room depends on various factors such as occupancy, ventilation requirements, and air quality standards.
The ASHRAE standard 62.1 provides guidelines for determining the minimum ventilation rates based on the number of occupants and the type of space.
The fresh air intake should be sufficient to dilute indoor pollutants and maintain a healthy indoor environment.
Factors like the pre...
CAM charges are calculated by dividing the total operating expenses of a property by the total square footage of the property.
Determine the total operating expenses of the property
Determine the total square footage of the property
Divide the total operating expenses by the total square footage to get the CAM charge per square foot
Multiply the CAM charge per square foot by the square footage of the tenant's leased space
Covid-19 protocol includes measures to prevent the spread of the virus such as wearing masks, social distancing, and sanitizing frequently touched surfaces.
Wearing masks is mandatory in public places
Maintaining social distancing of at least 6 feet
Frequent hand washing and sanitizing
Regular cleaning and disinfecting of frequently touched surfaces
Isolation and quarantine measures for infected individuals
Remote work and v...
Crisis management is the process of handling and mitigating unexpected events that can harm an organization's reputation or operations.
Identifying potential crises and developing a plan to address them
Communicating effectively with stakeholders during a crisis
Implementing the crisis management plan and taking appropriate actions
Evaluating the effectiveness of the crisis management plan and making improvements
Examples i...
based on 2 interviews
1 Interview rounds
based on 19 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹3.5 L/yr - ₹14.5 L/yr |
Facility Executive
996
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Assistant Project Leader
565
salaries
| ₹3.3 L/yr - ₹12 L/yr |
Senior Analyst
557
salaries
| ₹3 L/yr - ₹12.1 L/yr |
Assistant Facility Manager
523
salaries
| ₹3 L/yr - ₹10.3 L/yr |
CBRE
NoBroker
Cushman & Wakefield
Colliers India