i
JJREALIS
Filter interviews by
I applied via Approached by Company and was interviewed in Sep 2021. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
M25 concrete is a mix of concrete with a compressive strength of 25 N/mm².
M25 concrete is a standard mix used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 N/mm² after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and roads.
Rate analysis is the process of determining the cost of materials, labor, and equipment required for plastering and brick work.
Rate analysis involves breaking down the cost of materials, labor, and equipment for a specific project.
For plastering, the cost of materials such as cement, sand, and water must be calculated, along with the cost of labor and equipment such as trowels and scaffolding.
For brick work, the cost o...
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
Box type waterproofing involves creating a sealed enclosure to prevent water damage.
Start by preparing the surface to be waterproofed
Apply a waterproofing membrane to the surface
Seal all joints and corners to ensure complete waterproofing
Test the waterproofing by filling the box with water and checking for leaks
Asked about the methodology for wp work
Hypothetical Project will given to find the project estimate and schedule
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
M25 concrete is a mix of concrete with a compressive strength of 25 N/mm².
M25 concrete is a standard mix used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 N/mm² after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and roads.
Rate analysis is the process of determining the cost of materials, labor, and equipment required for plastering and brick work.
Rate analysis involves breaking down the cost of materials, labor, and equipment for a specific project.
For plastering, the cost of materials such as cement, sand, and water must be calculated, along with the cost of labor and equipment such as trowels and scaffolding.
For brick work, the cost o...
I applied via Referral and was interviewed before Dec 2020. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Project Engineer
6
salaries
| ₹2.7 L/yr - ₹5.2 L/yr |
Project Coordinator
3
salaries
| ₹2.7 L/yr - ₹3.5 L/yr |
Balaji Enterprises
Mahaveer Group
Lansum Properties
Rajwada Group