Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
Waveforms on sheet metal can be measured using various techniques such as strain gauges, laser scanning, and ultrasonic testing.
Strain gauges can be attached to the sheet metal to measure the deformation caused by the waveforms.
Laser scanning can be used to create a 3D model of the sheet metal and analyze the waveform patterns.
Ultrasonic testing can be used to detect any defects or irregularities in the sheet metal cau...
Flatness refers to the deviation of a surface from a perfect plane, while surface roughness refers to the texture of the surface.
Flatness is a measure of how level a surface is, while surface roughness is a measure of how bumpy or irregular the surface is.
Flatness is typically measured using a straightedge or surface plate, while surface roughness is measured using instruments like profilometers or roughness testers.
Fl...
Allowable tolerances on casting surface depend on the application and material used.
Tolerances are specified in engineering drawings and depend on the casting process and material used.
Surface roughness, dimensional accuracy, and shape deviation are important factors to consider.
Tolerances can range from +/- 0.1 mm to +/- 5 mm depending on the application.
For example, a casting used in a high-precision aerospace applic...
Allowable tolerances on machining surface depend on the specific application and material being machined.
Tolerances can range from +/- 0.001 inches to +/- 0.010 inches depending on the application.
Materials with higher hardness or brittleness may require tighter tolerances.
Surface finish requirements may also impact allowable tolerances.
Consulting industry standards and customer specifications is important to determine
Initiated and completed 10 Kaizen activities in the past year.
Implemented a daily 5S checklist to maintain workplace organization
Reduced setup time for a production line by 30% through SMED techniques
Implemented a visual management system to track inventory levels
Conducted a value stream mapping exercise to identify and eliminate waste
Trained employees on problem-solving techniques through Kaizen workshops
Reduce lead time of product
Streamline production process
Implement lean manufacturing principles
Reduce setup and changeover times
Improve supply chain management
Use predictive analytics to forecast demand
Invest in automation and robotics
Collaborate with suppliers to reduce lead times
Top trending discussions
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
Handling loss of RMHS materials involves proper inventory management, tracking systems, and security measures.
Implement a robust inventory management system to track all RMHS materials
Regularly conduct audits to ensure accuracy of inventory records
Utilize security measures such as surveillance cameras, access control systems, and restricted access areas
Train staff on proper handling and storage procedures to prevent lo...
Some electrical project ideas for in house improvements include installing smart home technology, upgrading lighting fixtures, and adding solar panels.
Install smart home technology for energy efficiency and convenience
Upgrade lighting fixtures to improve aesthetics and energy efficiency
Add solar panels to reduce electricity costs and environmental impact
Sap pm and electrically
based on 5 reviews
Rating in categories
Associate Manager
27
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Executive
26
salaries
| ₹3 L/yr - ₹10 L/yr |
Quality Engineer
18
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Manager
11
salaries
| ₹9.9 L/yr - ₹14.4 L/yr |
Quality Inspector
10
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Rashmi Metaliks
SHYAM METALICS AND ENERGY
Electrotherm
Jai Balaji Group