Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
I am a dedicated and experienced Maintenance Engineer with a strong background in troubleshooting and problem-solving.
I have a Bachelor's degree in Mechanical Engineering
I have 5+ years of experience in maintenance engineering
Proficient in conducting preventive maintenance and repairs on industrial equipment
Skilled in using various tools and equipment for maintenance tasks
Strong analytical and problem-solving skills
Exc
Top trending discussions
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
posted on 28 Jun 2023
I appeared for an interview before Jun 2022.
posted on 19 Jul 2024
A circuit diagram of hydraulics shows the flow of hydraulic fluid through a system of valves, cylinders, and pipes.
Hydraulic pump: generates pressure to move fluid through the system
Valves: control the direction and flow rate of the fluid
Cylinders: convert fluid pressure into mechanical force
Pipes: transport the fluid between components
Pressure gauges: monitor the pressure levels in the system
posted on 8 Mar 2025
I appeared for an interview before Mar 2024.
I applied via Campus Placement and was interviewed in Jan 2024. There was 1 interview round.
The manufacturing process for producing a component involves several steps.
Designing the component
Material selection
Machining or forming the raw material
Assembly of the component
Quality control and inspection
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Associate Manager
27
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Executive
26
salaries
| ₹3 L/yr - ₹10 L/yr |
Quality Engineer
18
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Manager
11
salaries
| ₹9.9 L/yr - ₹14.4 L/yr |
Quality Inspector
10
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Rashmi Metaliks
SHYAM METALICS AND ENERGY
Electrotherm
Jai Balaji Group