i
Jindal Saw
Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
General Awareness , Mathematics,
Self introduction , previous company work responsibility
RAC stands for Resource Allocation Chart, a tool used to assign resources to specific tasks in a project.
RAC helps in visualizing resource allocation and identifying potential bottlenecks.
It ensures that resources are allocated efficiently and effectively.
RAC can be used in project management to track resource utilization and availability.
It helps in optimizing resource allocation to meet project deadlines and goals.
Types of steel include carbon steel, alloy steel, stainless steel, and tool steel. Common heat treatment processes include annealing, quenching, tempering, and normalizing.
Types of steel: carbon steel, alloy steel, stainless steel, tool steel
Heat treatment processes: annealing, quenching, tempering, normalizing
Examples: Carbon steel - used in construction, Alloy steel - used in automotive industry, Stainless steel - us...
I applied via Job Fair and was interviewed before May 2022. There were 2 interview rounds.
Top trending discussions
posted on 12 Nov 2019
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
posted on 22 Oct 2023
I applied via Job Portal and was interviewed before Oct 2022. There were 4 interview rounds.
Written exam should be conducted.
Our current plant process focuses on lean manufacturing principles to optimize efficiency and reduce waste.
Utilization of Kanban system for inventory management
Implementation of 5S methodology for workplace organization
Regular Gemba walks to identify and address process inefficiencies
Continuous improvement through Kaizen events
Cross-training of employees to increase flexibility and productivity
posted on 15 Oct 2023
RTT details for tower erection, foundation, and JV involve planning, coordination, and execution of construction activities.
RTT stands for Radio Tower Technology, which includes the process of erecting communication towers.
Tower foundation involves the construction of a stable base to support the tower structure.
JV (Joint Venture) may refer to a partnership between two or more companies to undertake the tower construct...
GBT details for tower erection and foundation involve planning, design, and construction of the tower structure.
GBT stands for Guyed Tower Base
Tower erection involves assembling and installing the tower structure
Tower foundation involves designing and constructing the base to support the tower
Proper planning and engineering calculations are essential for a safe and stable tower structure
posted on 24 Feb 2025
I was interviewed before Feb 2024.
I have experience handling temperatures up to 500 degrees Fahrenheit in a manufacturing setting.
Handled temperatures up to 500 degrees Fahrenheit in a manufacturing environment
Experience with operating machinery and equipment at high temperatures
Implemented safety protocols to ensure proper handling of high temperatures
In the event of a power failure or DCS failure, I would take immediate actions to ensure minimal disruption to operations.
Notify relevant personnel and stakeholders about the situation
Activate backup power sources if available
Implement emergency shutdown procedures to prevent damage to equipment
Troubleshoot the cause of the failure and work towards restoring power or DCS functionality
Communicate updates and progress to
Basic exam with some technical questions
Group of 6 were given a topic and we discussed.
Structural bridges can be made of various materials while concrete bridges specifically use concrete as the primary material.
Structural bridges can be made of steel, wood, or other materials, while concrete bridges are primarily made of concrete.
Concrete bridges are known for their durability and strength, making them a popular choice for infrastructure projects.
Structural bridges may require more maintenance and upkee...
The Howrah Bridge is a cantilever bridge that spans the Hooghly River in West Bengal, India.
Built in 1943, it is one of the busiest bridges in the world, carrying over 100,000 vehicles and countless pedestrians daily.
The bridge does not have any nuts or bolts and is held together by rivets.
It is a famous landmark in Kolkata and is often referred to as the 'Gateway of Kolkata'.
I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
Prepare the core subjects som Thermo fluids and asked some of the manufacturing process
How we can reduce the use of non renewable resources
posted on 27 Apr 2024
I was interviewed before Apr 2023.
Debate on multiple topics
Come out with a conclusion and solutions to a problem
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.
My vision is to continuously improve and innovate, while fostering a positive and collaborative work environment.
Implement new technologies to streamline processes and increase efficiency
Encourage open communication and feedback among team members
Provide opportunities for professional development and growth
Maintain a strong focus on customer satisfaction
Stay up-to-date with industry trends and best practices
Example: Im...
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
395
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
359
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
244
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel