Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2021. There were 4 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 5 interview rounds.
I am highly skilled in decision making and have a strong track record of making effective and efficient decisions.
I have a systematic approach to decision making, considering all relevant factors and weighing the pros and cons.
I am able to analyze complex situations and quickly identify the best course of action.
I am confident in my decision making abilities and can make tough decisions under pressure.
I have a history ...
I have strong technical skills.
I have a deep understanding of various programming languages and frameworks.
I have experience in designing and implementing complex systems.
I am proficient in troubleshooting and resolving technical issues.
I continuously update my skills to stay up-to-date with the latest technologies.
I have successfully completed several challenging projects in the past.
Strong communication skills with experience in presenting technical information to both technical and non-technical audiences.
Experience in delivering presentations and explaining complex technical concepts in a clear and concise manner.
Ability to adapt communication style based on the audience, whether it's colleagues, clients, or stakeholders.
Active listening skills to understand and address concerns or questions eff...
Confidence is the belief in oneself, while skill is the ability to perform a task.
Confidence is a subjective feeling, while skill is a measurable capability.
Confidence can be influenced by external factors, while skill is developed through practice and experience.
Confidence can vary from person to person, while skill can be objectively assessed.
Confidence alone may not guarantee success, but skill is essential for achi...
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
I appeared for an interview before Mar 2024, where I was asked the following questions.
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
106
salaries
| ₹4.2 L/yr - ₹11.5 L/yr |
Senior Engineer
53
salaries
| ₹4 L/yr - ₹8.1 L/yr |
Deputy Manager
43
salaries
| ₹8 L/yr - ₹13.5 L/yr |
Manager
38
salaries
| ₹7.8 L/yr - ₹21 L/yr |
Weigh Bridge Operator
25
salaries
| ₹1.3 L/yr - ₹3.5 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
New Allenberry Works