Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
Quantity take-off related
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
posted on 12 May 2024
I applied via Approached by Company
Yes, code is a mode of measurement used in quantity surveying.
Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.
It helps in accurately estimating the quantities of materials and labor required for a project.
Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
I was interviewed in Aug 2017.
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 8 Apr 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
posted on 5 Jun 2023
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
Assistant Manager
5
salaries
| ₹7 L/yr - ₹8.5 L/yr |
Deputy Finance Controller
4
salaries
| ₹8.5 L/yr - ₹10.9 L/yr |
Plaza Controller
4
salaries
| ₹2.6 L/yr - ₹3 L/yr |
Senior Field Engineer
4
salaries
| ₹6 L/yr - ₹7 L/yr |
Civil Site Engineer
4
salaries
| ₹2.2 L/yr - ₹3.3 L/yr |
DLF
Larsen & Toubro Limited
Tata Projects
GMR Group