I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jun 2024. There were 3 interview rounds.
A common topic was presented, and everyone had to share their opinions.
I have completed various projects including a market research analysis, a social media campaign, and a website redesign.
Market research analysis for a new product launch
Social media campaign to increase brand awareness
Website redesign to improve user experience
I want to join Atkins Realis because of their reputation for innovative projects and commitment to sustainability.
Atkins Realis is known for their cutting-edge projects in engineering and design
I am impressed by their focus on sustainability and environmental responsibility
I believe working at Atkins Realis will provide me with valuable experience and opportunities for growth
I have a passion for photography and have won several awards for my work.
I have been practicing photography as a hobby for the past 5 years
I have won awards in local photography competitions for my landscape and portrait photography
I have a portfolio of my work that showcases my skills and creativity
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
posted on 24 Aug 2024
An audit is conducted in stages from planning to completion, involving risk assessment, testing, documentation, and reporting.
1. Planning stage involves understanding the client's business, identifying risks, and developing an audit plan.
2. Risk assessment is crucial to determine the areas to focus on during the audit.
3. Testing stage includes gathering evidence, performing analytical procedures, and conducting substan...
posted on 13 Jun 2024
Safety Management System is a systematic approach to managing safety, including policies, procedures, and processes.
SMS involves identifying hazards, assessing risks, and implementing controls to mitigate risks.
It includes setting safety goals, monitoring performance, and continuously improving safety practices.
SMS helps organizations comply with regulations, reduce incidents, and create a safer work environment.
Exampl...
Hazard is a potential source of harm, risk is the likelihood of harm occurring, and control measures are actions taken to reduce or eliminate the risk.
Hazard: Any potential source of harm or adverse health effect.
Risk: The likelihood of harm occurring from exposure to a hazard.
Control Measure: Actions taken to reduce or eliminate the risk associated with a hazard.
Example: Hazard - Chemical exposure, Risk - Inhalation o...
Fault Tree Analysis is a systematic, deductive method used to identify the root causes of a system failure.
It starts with identifying the top event, which is the system failure.
Then, it breaks down the top event into intermediate events and basic events using logic gates.
Basic events are the lowest level events that directly contribute to the top event.
By analyzing the relationships between events, potential causes of ...
posted on 11 Feb 2024
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
posted on 11 Jun 2024
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
The number of limit switches in a tower crane varies depending on the specific model and manufacturer.
The number of limit switches in a tower crane can range from 2 to 6 or more.
Limit switches are used to prevent the crane from overtraveling or overloading.
Common types of limit switches used in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switches.
Safety culture in project,hou many year of experience in safety field, inspection
based on 45 reviews
Rating in categories
Assistant Manager
5
salaries
| ₹7 L/yr - ₹8.5 L/yr |
Deputy Finance Controller
4
salaries
| ₹8.5 L/yr - ₹10.9 L/yr |
Plaza Controller
4
salaries
| ₹2.6 L/yr - ₹3 L/yr |
Senior Field Engineer
4
salaries
| ₹6 L/yr - ₹7 L/yr |
Civil Site Engineer
4
salaries
| ₹2.2 L/yr - ₹3.3 L/yr |
DLF
Larsen & Toubro Limited
Tata Projects
GMR Group