Upload Button Icon Add office photos

Jal International

Compare button icon Compare button icon Compare

Filter interviews by

Jal International Land Surveyor Interview Questions and Answers for Experienced

Updated 28 Dec 2021

Jal International Land Surveyor Interview Experiences for Experienced

1 interview found

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 21 Dec 2021

Interview Questionnaire 

1 Question

  • Q1. There is 1 bech mark,how to setup machine total station??
  • Ans. 

    The machine total station can be set up using the bech mark as a reference point.

    • Place the total station over the bech mark.

    • Level the instrument using the built-in bubble level.

    • Enter the coordinates of the bech mark into the total station.

    • Perform a backsight measurement to the bech mark.

    • Perform a foresight measurement to the desired point.

    • Record the data and repeat for additional points.

    • Adjust the instrument as necessa

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview is technical related question from your field.i was able to most of question crruectly.

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Related to survey
  • Q2. Civil survey infrastructure

I applied via Recruitment Consultant

Interview Questionnaire 

2 Questions

  • Q1. I am MOHAMMAD WAQUAR ALAM
  • Q2. I am MOHAMMAD WAQUAR ALAM i have 6 years Abroad experience also 3 years india experience total experience 9 years

Interview Preparation Tips

Interview preparation tips for other job seekers - You have land surveyor vacances contact Mob_XXXXX50

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Abou glass & aluminium
  • Q2. About Precast work
  • Q3. About construction
  • Q4. About AutoCAD

Interview Preparation Tips

Interview preparation tips for other job seekers - I have advice 1st make you're strong CV and study about your job and belive your god he protects you

I applied via Referral and was interviewed before Jul 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to survey , building , construction, foundations, excavation, excavation quantity, residential building, commercial buildings, open lands survey , Total station , dumpy level, AutoCAD and more

Interview Preparation Tips

Interview preparation tips for other job seekers - Written test and field test.

Interview Questionnaire 

7 Questions

  • Q1. Convert quadrant bearing to whole circle bearing.
  • Ans. 

    To convert quadrant bearing to whole circle bearing, add 90 degrees to the quadrant bearing.

    • Quadrant bearings range from 0 to 90 degrees.

    • Whole circle bearings range from 0 to 360 degrees.

    • To convert, add 90 degrees to the quadrant bearing.

    • For example, a quadrant bearing of N45°E would become 135°.

  • Answered by AI
  • Q2. What is contour.
  • Ans. 

    Contours are lines on a map that connect points of equal elevation, representing the shape and relief of the land.

    • Contours are used in land surveying to depict the topography of an area.

    • They connect points of equal elevation, allowing surveyors to visualize the shape and relief of the land.

    • Contours are typically represented as curved lines on a map, with each line representing a specific elevation.

    • The spacing between c...

  • Answered by AI
  • Q3. How to find out angle and distance a polygon.
  • Ans. 

    To find out the angle and distance of a polygon, you can use trigonometry and surveying techniques.

    • Measure the lengths of each side of the polygon using a tape measure or surveying equipment.

    • Use a theodolite or total station to measure the angles between each side of the polygon.

    • Apply trigonometric formulas to calculate the angles and distances based on the measured values.

    • For example, you can use the Law of Cosines to...

  • Answered by AI
  • Q4. What is UTM
  • Ans. 

    UTM stands for Universal Transverse Mercator. It is a coordinate system used to locate positions on the Earth's surface.

    • UTM is a grid-based system that divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • It uses a metric coordinate system, with eastings and northings measured in meters.

    • UTM coordinates consist of a zone number, hemisphere (N or S), easting, and northing.

    • For example, a UTM coordinate might ...

  • Answered by AI
  • Q5. What is WGS
  • Ans. 

    WGS stands for World Geodetic System, a standard reference system used for mapping and surveying the Earth.

    • WGS is a global coordinate system used to accurately represent the Earth's surface.

    • It provides a consistent framework for measuring and locating points on the Earth's surface.

    • WGS is commonly used in GPS navigation, cartography, and land surveying.

    • It uses latitude and longitude coordinates to define positions on th...

  • Answered by AI
  • Q6. How to work GPS
  • Ans. 

    Working with GPS involves understanding its functions, using the correct equipment, and interpreting the data accurately.

    • Learn the basic functions of GPS devices and how to operate them.

    • Ensure that the GPS device is properly calibrated and has a clear view of the sky for accurate readings.

    • Use the appropriate GPS equipment for the specific surveying task, such as a handheld GPS unit or a survey-grade GPS receiver.

    • Unders...

  • Answered by AI
  • Q7. How many satellites want there gps receiver.
  • Ans. 

    The number of satellites a GPS receiver wants depends on its accuracy requirements and the availability of satellite signals.

    • The minimum number of satellites required for a GPS receiver to function is 4.

    • Most GPS receivers aim to acquire signals from at least 8 to 12 satellites for better accuracy.

    • The more satellites a GPS receiver can track, the more accurate its positioning and timing information becomes.

    • GPS receivers...

  • Answered by AI

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is principal of Surveying
  • Ans. 

    The principle of surveying involves measuring and mapping the Earth's surface to determine the relative positions of points.

    • Surveying is used to establish property boundaries, create topographic maps, and plan construction projects.

    • The principle of surveying relies on accurate measurements using various instruments such as total stations, GPS receivers, and levels.

    • Surveyors use mathematical calculations and trigonometr...

  • Answered by AI
  • Q2. Traversing

Interview Preparation Tips

Interview preparation tips for other job seekers - All civil & Land surveying

Interview Questionnaire 

1 Question

  • Q1. There is 1 bech mark,how to setup machine total station??
  • Ans. 

    The machine total station can be set up using the bech mark as a reference point.

    • Place the total station over the bech mark.

    • Level the instrument using the built-in bubble level.

    • Enter the coordinates of the bech mark into the total station.

    • Perform a backsight measurement to the bech mark.

    • Perform a foresight measurement to the desired point.

    • Record the data and repeat for additional points.

    • Adjust the instrument as necessa

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview is technical related question from your field.i was able to most of question crruectly.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Behavioral 

(2 Questions)

  • Q1. Leica instrument
  • Q2. Sokia instrument
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. My name is Gulam ahmed iam land surveyor
  • Q2. I now'the surveyor work total istation and auto level
  • Q3. And topcorn GPS fc500 model
  • Q4. I have a 11years of experience Indian and galf

Tell us how to improve this page.

Interview Questions from Similar Companies

Madina Group Interview Questions
4.5
 • 24 Interviews
NBTC GROUP Interview Questions
3.6
 • 19 Interviews
Focus Energy Interview Questions
3.5
 • 18 Interviews
Honeywell Uop Interview Questions
3.6
 • 14 Interviews
Valmet Interview Questions
4.1
 • 14 Interviews
CR Asia Interview Questions
4.1
 • 11 Interviews
View all

Jal International Land Surveyor Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Instrumentation Technician
10 salaries
unlock blur

₹1 L/yr - ₹8.5 L/yr

Testing & Commissioning Engineer
7 salaries
unlock blur

₹7 L/yr - ₹18 L/yr

Project Engineer
6 salaries
unlock blur

₹9.3 L/yr - ₹20 L/yr

Electrical Engineer
5 salaries
unlock blur

₹9.6 L/yr - ₹15 L/yr

QA QC Engineer
5 salaries
unlock blur

₹7.8 L/yr - ₹9.8 L/yr

Explore more salaries
Compare Jal International with

NBTC GROUP

3.6
Compare

Al Turki Enterprises

3.7
Compare

Sterling Oil Exploration & Energy Production

3.6
Compare

Arabian Industries

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview