Filter interviews by
I applied via Walk-in and was interviewed before Jan 2019. There was 1 interview round.
Isometric drawing is a 3D representation of an object on a 2D surface using equal angles for all three axes.
It is a type of pictorial drawing
It shows the object from three sides: front, top, and side
All three axes are drawn at equal angles of 120 degrees
It is commonly used in engineering and architecture
It helps to visualize the object in 3D and understand its dimensions and proportions
There are several types of drawings, including architectural, engineering, mechanical, and electrical drawings.
Architectural drawings show the design and layout of buildings and structures.
Engineering drawings depict the technical details of machines, equipment, and systems.
Mechanical drawings illustrate the components and assembly of mechanical systems.
Electrical drawings show the wiring and electrical components of b...
A work permit is a document that authorizes a person to work legally in a specific country or region.
Work permits are issued by governments or authorized agencies.
They are required for foreign nationals to work legally in a country.
Work permits may have restrictions on the type of work or employer.
They may also have an expiration date and require renewal.
Examples of work permits include H-1B visas in the United States
Top trending discussions
posted on 2 Mar 2025
I was interviewed in Sep 2024.
What about the share market
posted on 21 Nov 2023
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
posted on 17 Feb 2025
Documents verification
posted on 15 Nov 2024
I applied via Indeed and was interviewed in Oct 2024. There was 1 interview round.
posted on 9 Feb 2025
Embankment is a raised bank or wall built to carry a road or to hold back water.
Embankment is a raised structure made of earth or other materials to support a road or railway.
Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.
Embankments are commonly used in road construction to elevate the road above the surrounding terrain.
Earthwork pr...
PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.
PQC laying is the process of laying the final layer of concrete pavement on roads.
It is done after the base and sub-base layers have been prepared and compacted.
PQC laying ensures a smooth and durable surface for vehicles to travel on.
Proper curing of PQC is essential to prevent cracks and ensure longevity.
Exa...
RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.
RCC drain is made of reinforced concrete to provide strength and durability.
It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.
RCC drains come in various shapes and sizes depending on the specific drainage requirements.
These drains are commonly used in urban areas to pre...
Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.
Kerb laying involves setting out the alignment and levels for the curbs.
The curbs are then placed and fixed in position using concrete or other suitable materials.
Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.
Properly laid curbs enhance the overal...
Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.
Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.
Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...
To manage store and outside material staging, organize inventory, maintain clear labeling, implement FIFO system, and regularly inspect and update stock levels.
Organize inventory in a systematic manner to easily locate items
Maintain clear labeling on shelves, bins, and containers for quick identification
Implement FIFO (First In, First Out) system to ensure older stock is used first
Regularly inspect and update stock lev
I have 3 years of experience working with ERP SAP in inventory management and data entry.
Managed inventory levels using SAP system
Entered data accurately and efficiently into SAP database
Generated reports on inventory status and trends
Collaborated with other departments to ensure accurate inventory records
based on 27 reviews
Rating in categories
Project Manager
4
salaries
| ₹10.1 L/yr - ₹13.8 L/yr |
Accountant
3
salaries
| ₹1 L/yr - ₹1.8 L/yr |
Site Engineer
3
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Senior Manager
3
salaries
| ₹4.9 L/yr - ₹13.5 L/yr |
QA QC Engineer
3
salaries
| ₹4 L/yr - ₹5.5 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon