Upload Button Icon Add office photos

Filter interviews by

J. Kumar Infraprojects Mechanical Maintenance Foreman Interview Questions and Answers

Updated 1 Nov 2022

J. Kumar Infraprojects Mechanical Maintenance Foreman Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(9 Questions)

  • Q1. Batching plant erection dismantle & mantinance
  • Q2. W m m plant erection operating mantinance & dismantle work
  • Q3. All tipe pipe line works
  • Ans. 

    Pipe line works involve installation, maintenance, and repair of pipelines used for transporting fluids or gases.

    • Installation of new pipelines

    • Maintenance of existing pipelines

    • Repair of damaged pipelines

    • Inspection of pipelines for leaks or other issues

    • Replacement of worn-out or outdated pipelines

    • Testing of pipelines for pressure and flow

    • Cleaning of pipelines to remove debris or blockages

  • Answered by AI
  • Q4. Rigar work & haydra crane work
  • Q5. Welding work and hard finishing work
  • Q6. R.o plant service & mantinance
  • Q7. Dewatering pump repair & mantinance electrical & mechanical
  • Q8. Electric work fan collar motor & light repair works
  • Q9. Work shop supervisor work

Interview Preparation Tips

Interview preparation tips for other job seekers - We sefe
Your sefe
My acupment sefe
My work aria clean
My tools clean
My focus only My work

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About maintenance
  • Q2. About HVAC maintenance
  • Q3. About hydraulic

Interview Preparation Tips

Interview preparation tips for other job seekers - If possible I again work in punj lloyad
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical related in construction.line
  • Q2. Penals substation, slab pipping. Machineries maintenance

Interview Preparation Tips

Topics to prepare for L&T Construction Electrical Foreman interview:
  • Electrical Maintenance
  • Penal
  • Slab pipping.
Interview preparation tips for other job seekers - Electrical work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Fire fiting HVAC System
  • Q2. How many pressure fire line
  • Ans. 

    The number of pressure fire lines can vary depending on the specific requirements of the system and facility.

    • The number of pressure fire lines is determined by the size and layout of the facility.

    • Pressure fire lines are typically installed in areas where there is a high risk of fire, such as industrial plants or commercial buildings.

    • The number of pressure fire lines may also be influenced by local fire safety regulatio...

  • Answered by AI
  • Q3. What is hvac requmamt neme
  • Ans. 

    HVAC requirements refer to the specifications and standards needed for heating, ventilation, and air conditioning systems in a building or facility.

    • HVAC requirements include proper sizing of equipment to meet the heating and cooling needs of a space

    • They also involve ensuring proper ventilation to maintain indoor air quality

    • Compliance with building codes and regulations is essential for HVAC systems

    • Regular maintenance a...

  • Answered by AI
  • Q4. How many sprlar tipe
  • Ans. 

    The question is unclear and does not make sense. It seems to be a typo or a mistake.

    • The question may be asking about a specific type of equipment or tool, but it is not clear.

    • It is important to ask for clarification or more information to provide an accurate answer.

    • Without more context, it is impossible to determine what 'sprlar tipe' refers to.

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Firefiting hvac Systems
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 6 interview rounds.

Round 1 - Group Discussion 

Any questions asking related civil construction

Round 2 - Technical 

(2 Questions)

  • Q1. Any questions asking
  • Q2. Site work related
Round 3 - One-on-one 

(1 Question)

  • Q1. Step by step asking questions
Round 4 - HR 

(2 Questions)

  • Q1. Documents paper & site
  • Q2. Any questions available
Round 5 - Aptitude Test 

Behavior is must be staff & company

Round 6 - Case Study 

Safety related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir
I'm hard working in 14 years life
& completed work then other work start

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is your name to be good in future
  • Q2. What's your parents name in future be like
  • Q3. Good teacher value to be created to like fir bever

Interview Preparation Tips

Interview preparation tips for other job seekers - Good start bhccbhh jhrdniv hddxjuydvj frivgh vyrgiufhjhb
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel,scaffolding, concrete, labour bill,client bill,procurements, punctuality,

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge you get good job,
Without knowledge no get any job,
Work hardly and you get job

I was interviewed in Oct 2021.

Round 1 - Technical 

(1 Question)

  • Q1. Running units me condencer vacuum pump trip hogya toa kya hoga ? Running me pump flow nahiderha hai toa q? Brg pumps & trubine centring kya hai ? Mechanical seal types & use pumps ,,brg type & parts & ...
Round 2 - Technical 

(1 Question)

  • Q1. Brg temperature q badhta hai

Interview Preparation Tips

Interview preparation tips for other job seekers - Parfect riading & clining , any job full details

Interview Questionnaire 

11 Questions

  • Q1. Am civil service. I required job
  • Q2. Required job
  • Q3. Civil foreman job equired
  • Q4. I am civil foreman
  • Q5. Get you job
  • Q6. I am interested in jmc
  • Q7. Get job
  • Q8. Required for job
  • Q9. Job requirements
  • Q10. I am interested job
  • Q11. Please refer

Interview Questionnaire 

1 Question

  • Q1. Reinforcement foreman 11 year experience

J. Kumar Infraprojects Interview FAQs

How many rounds are there in J. Kumar Infraprojects Mechanical Maintenance Foreman interview?
J. Kumar Infraprojects interview process usually has 2 rounds. The most common rounds in the J. Kumar Infraprojects interview process are Resume Shortlist and Technical.
What are the top questions asked in J. Kumar Infraprojects Mechanical Maintenance Foreman interview?

Some of the top questions asked at the J. Kumar Infraprojects Mechanical Maintenance Foreman interview -

  1. All tipe pipe line wo...read more
  2. Electric work fan collar motor & light repair wo...read more
  3. W m m plant erection operating mantinance & dismantle w...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 675 Interviews
Tata Projects Interview Questions
4.3
 • 396 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 126 Interviews
AtkinsRealis Interview Questions
4.0
 • 83 Interviews
View all

J. Kumar Infraprojects Mechanical Maintenance Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-Life balance

3.0

Salary & Benefits

3.0

Job Security

3.0

Company culture

3.0

Promotions/Appraisal

3.0

Work Satisfaction

Explore 1 Review and Rating
Junior Engineer
185 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Civil Engineer
169 salaries
unlock blur

₹2 L/yr - ₹9 L/yr

Civil Site Engineer
160 salaries
unlock blur

₹2 L/yr - ₹6.6 L/yr

Senior Engineer
132 salaries
unlock blur

₹4.5 L/yr - ₹11.2 L/yr

Junior Engineer Civil
120 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Explore more salaries
Compare J. Kumar Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview