Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed before May 2022. There were 4 interview rounds.
60 question from mechanical engineering"s all subjects
Top trending discussions
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 18 Nov 2020
Android architecture stack is a set of layers that make up the Android operating system.
The stack includes four main layers: Linux kernel, native libraries, Android runtime, and application framework.
The Linux kernel provides low-level system functionality.
Native libraries are written in C or C++ and provide access to hardware-specific features.
The Android runtime includes the Dalvik virtual machine and core libraries.
...
AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.
AIDL is used to define the interface between client and service in Android.
It allows communication between different processes in Android.
AIDL is used to pass complex data types between processes.
AIDL is similar to Remote Procedure Call (RPC) in other programming languages.
Example: AIDL is used in Android to implement...
Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.
Hash set stores unique values without any specific order.
Hash map stores key-value pairs and allows fast retrieval of values based on keys.
Both use hashing to map keys to their corresponding values.
In Java, HashSet and HashMap are implementations of these data structures.
posted on 12 May 2018
posted on 4 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
275
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
183
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
168
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Hindustan Construction Company
Simplex Infrastructures